Skip to content

AERC · Assam Electricity Regulatory Commission

Smart Grid Regulations, 2017

AERC Smart Grid Regulations, 2017

RegulationDated 20 Sep 2017Published in the Gazette 22 Sep 2017ABRC/461/2t}I4/52 dated 20th September, 2017

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

These are the Assam Electricity Regulatory Commission (Smart Grid) Regulations, 2017, made by AERC under clause (zp) of sub-section (2) of section 181 of the Electricity Act 2003 (p1). They extend to the whole of Assam and come into force from publication in the Assam Gazette, printed as 22 September 2017; the notification is dated 20 September 2017 (p1). This is a framework regulation, not an amendment: it creates an approval, cost-recovery, standards, data-protection and governance regime for smart grid investment, to be applied in conjunction with the Commission's existing tariff, standards-of-performance, grid code, supply code, renewable and solar regulations (p4).

Chapter I (pp1–4) gives the short title, extent and commencement and defines the working vocabulary — advanced metering infrastructure, aggregators, distributed generation, microgrids, prosumers, smart grid, cyber security, WAMS and the CEA/BIS/IEGC instruments. Chapter II (pp4–5) states the objectives (efficiency, network security, renewable integration, visibility, asset utilisation, customer service and prosumer participation) and the scope: investment approval, tariff design, incentive/disincentive design, consumer privacy, standard adoption, cyber security and renewable integration.

The operative core (pp5–9) governs investment and money. Licensees file an integrated multi-year smart grid plan with their multi-year tariff or ARR petition; projects above a rupee investment threshold need prior Commission approval, while smaller investments within an approved plan do not. Detailed project reports must cover technical feasibility, cost-benefit analysis, cost-recovery mechanism, implementation schedule, monitoring and awareness building. Cost recovery is through the ARR, specific tariff schemes on participating consumers, surcharges on specified categories, or pricing of new services; the Commission specifies the methodology by order. Tariff designs may include time-of-use, critical peak and real-time pricing variants, with incentives and penalties keyed to programme adherence, and an R&D provision may be allowed in the ARR of the distribution licensee, the transmission licensee and the Load Dispatch Centre, held in separately accounted funds.

The standards and consumer-protection chapters (pp9–12) adopt system, network, communication, product and performance standards in a stated hierarchy (CEA/BIS, falling back to IEC/IEEE/ANSI), require performance to be measured through the project's own measurement, visualisation and analytics facilities, and set customer data protection duties — classification of personally identifiable information versus customer-specific energy usage data, encryption, restrictions on third-party disclosure, and consumer access to their own data. Provision is also made for testing and certification, awareness and capacity building, consumer participation incentives and dispute resolution through the Consumer Grievance Redressal Forum and Ombudsman.

Chapter VII (pp12–13) requires licensees to constitute a Smart Grid Cell headed by a nodal officer with defined planning, DPR, monitoring and reporting functions. Chapter VIII (pp13–15) covers evaluation, measurement and verification, KPI definition, project progress and completion reporting, orders and practice directions, and the Commission's reserved powers of relaxation, interpretation, amendment and removal of difficulties, with savings clauses. Schedule-I (p16) lists the indicative smart grid project components.

Standard name
Smart Grid Regulations
Primary topics
Smart grid, Capital cost and investment, Tariff determination

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of AERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document