JSERC · Jharkhand State Electricity Regulatory Commission
Intra-State Deviation Settlement Mechanism and Related Matters Regulations, 2026 — Draft
Jharkhand State Electricity Regulatory Commission (Intra-State Deviation Settlement Mechanism and Related Matters) Regulations, 2026
Draft regulationDated 24 Jul 2026
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft principal regulation published by the Jharkhand State Electricity Regulatory Commission on 24 July 2026 (p1). It would create a market-linked intra-state deviation settlement mechanism (DSM) for Jharkhand, aligned to the principles of the CERC DSM Regulations, 2024 (p10, p41, p44). It is issued for public comment under Section 181(3) of the Electricity Act, 2003 (p50); it would take effect on Gazette publication or such other date as the Commission notifies, and no Gazette date is printed (p1).
The operative regulations (pp1–26). Regulations 1–3 give the short title, extent to the whole State, and the objective of a transparent, non-discriminatory and commercially enforceable deviation framework (p1, p5). Regulation 4 fixes who is caught: sellers of 10 MW and above connected to the intra-state transmission system (including renewable generators other than wind and solar, open access and captive generators other than in-situ captive), and buyers — distribution licensees, deemed distribution licensees and full open access consumers on InSTS; sub-threshold sellers, distribution-connected sellers, partial open access consumers, wind and solar, and CPP standby overdrawal are pushed to other instruments (p5–7). Regulation 5 imposes duties on the SLDC and State Entities — contract disclosure, compliance with the IEGC 2023 and State Grid Code, connection/open access agreements, AMR metering, and binding SLDC despatch instructions (p7–8). Regulation 6 sets the design parameters of the mechanism: a 96-block scheduling day, least-cost despatch, weekly settlement, kWh/INR measurement units, the six-block sign-change obligation, deviation volume limits and allocation of intra-state transmission losses (p8–11). Regulations 7–8 cover scheduling and the treatment of gaming, with enquiry powers and disallowance of receivable deviation charges (p11–13). Regulations 9–12 are the charging core: deviation is computed on formulae for sellers and buyers, but the methodology is expressly that of the CERC DSM Regulations, 2024 with State-specific modifications (p13–14); the Normal Rate is defined as the highest of I-DAM ACP, RTM ACP and a composite including ancillary service charges (p13–14); and frequency-linked charge tables are given for general sellers, RoR hydro, MSW sellers, standalone energy storage and buyers, with volume-limit bands, infirm-power and start-up power treatment, HP-DAM reference rate and zero charging during grid disturbance/force majeure (p14–20). Regulations 13–15 establish the State Energy Account, the weekly deviation charges statement, the State Deviation Pool Account with its credit/charge entries, appropriation waterfall and surplus-utilisation rules, and payment timelines, late payment surcharge and Letter of Credit security (p20–25). Regulations 16–20 create a State Power Committee for governance and reserve to the Commission powers to amend, remove difficulties, relax and issue directions (p25–26).
Annexures I–XII (pp27–40) are worked illustrations of the above — implementation workflow, deviation formulae, NR/RR computation, seller/RoR/MSW/ESS/buyer price vectors, volume limits and sign-change, weekly settlement and LC, loss allocation and force majeure. They state they are illustrative and do not override the regulations (p27).
Statement of Reasons (pp40–50) explains the move to a market-linked DSM, the retention of State-specific frequency and volume-limit safeguards, differentiated treatment of hydro and storage, the strengthened gaming framework, payment security, and invites comments before final notification (p50).
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.