Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Specific Conditions of Distribution Licence for AEML SEEPZ, 2023 — Statement of Reasons

Maharashtra Electricity Regulatory Commission (Specific Conditions of Distribution Licence applicable to AEML SEEPZ Limited for SEZ at Santacruz Electronic Export Processing Zone, Andheri (East) Mumbai) Regulations, 2023

Statement of reasonsDated 12 Jun 2023

The commission's reasons for a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is MERC's Statement of Reasons dated 12 June 2023 for the Specific Conditions of Distribution Licence Regulations, 2023 applicable to AEML SEEPZ Ltd (ASL) for the SEEPZ SEZ, Andheri (East), Mumbai (p1). It records ASL's appointment as SEZ Co-Developer, its deemed distribution licensee status under the proviso to Section 14(b) of the Electricity Act 2003 taken on record by MERC's order dated 6 June 2022, and the public consultation on the draft 2022 regulations — public notice on 28 February 2023, comments due 30 March 2023, and no public objection other than ASL's comments (p1–2).

The substantive part addresses three ASL objections to draft Regulations 4.2, 4.3 and 4.4. On Issue I, MERC retains Regulations 4.2 and 4.3 because they specify the consequence — loss of deemed licensee status on SEZ de-notification, suspension/termination as co-developer, or lease expiry — which Regulation 4.4 does not state (p2). On Issue II, MERC rejects the alleged circularity and inserts “amendment/revocation/repeal” into Regulation 4.4 so the licensee can approach the Commission within 15 days even after losing deemed licensee status, and can seek directions on interim supply (p3). On the third issue, MERC rejects ASL's request to replace Regulation 4.4 with the equivalent GEPL 2015 clause, holding that unlicensed supply is prohibited and any interim supply must be time-bound and Commission-directed (p3–4). The draft specific conditions are finalised with the minor change to Regulation 4.4 (p4).

Standard name
Licensing Regulations
Primary topics
Licensing and licence conditions

Read with this

Voltaic does not hold the regulation itself.

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document