APERC · Andhra Pradesh Electricity Regulatory Commission
SLDC Fees and Charges Regulation, 2006
Andhra Pradesh Electricity Regulatory Commission (Levy and collection offees and charges by State Load· Despatch Centre) Regulation, 2006
RegulationDated 26 Jul 2006Published in the Gazette 27 Jul 2006In force from 1 Apr 2007
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Andhra Pradesh Electricity Regulatory Commission (Levy and collection of fees and charges by State Load Despatch Centre) Regulation, 2006, notified as Regulation No.1 of 2006 (p1), creates the framework under which APERC determines and the SLDC levies and collects fees and charges from users of the intra-state transmission network in Andhra Pradesh. It is made under s.181(2)(g) read with s.32(3) of the Electricity Act 2003 and follows the State Government's decision that the existing SLDC continue to be operated by APTRANSCO as STU until a Government company/authority/corporation is established (p1). It applies to all generating companies and licensees engaged in intra-state transmission and expressly does not apply to stand-alone generators, franchisees and others not connected to the intra-state transmission network (p2). It comes into force on 1 April 2007 (p2).
Part I (Preliminary) gives the short title, extent, commencement and definitions, and directs proceedings to be governed by APERC's Conduct of Business Regulations in force (p2). Regulation 3 requires generating stations to register with SLDC and existing users to apply for registration, with SLDC scrutiny, intimation and annual reporting to the Commission (p2–3). Regulation 4 sets out the annual fee and monthly operating charges: the fee is determined by the Commission based on capital cost recovery, with a formula linking capital cost and total generation capacity, and operating charges cover employee cost, administration and general expenses, repairs and maintenance and other Commission-approved costs (p3–4). It requires SLDC to file a staffing plan for approval and describes how first control period expenses are fixed (p4).
Regulation 5 provides collection mechanics: annual fee in advance in two equal instalments, monthly operating charges, a surcharge on unpaid amounts, and an advance security deposit (p4–5). Regulation 6 requires SLDC to file fee/charges and investment plans, defines control periods and mandates website publication (p5). Regulation 7 requires APTRANSCO to keep separate SLDC accounts, relying on the Transmission Tariff Regulation 2005 (p5). Regulations 8–11 deal with when determined charges take effect and remain valid, use of information, power to amend, and savings (p5–6). Annexures A and B prescribe registration application formats for generating companies and distribution licensees/electricity traders (p7–8).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.