Skip to content

CERC · Central Electricity Regulatory Commission

Corrigendum dated 3 May 2017

Corrigendum

NotificationDated 3 May 2017Published in the Gazette 19 Apr 2017No. L-1/18/2010-CERC dated 3 rd May, 2017

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page corrigendum (p1) from the Central Electricity Regulatory Commission, issued in New Delhi on 3 May 2017, correcting two cross-references in the Commission's own notification No. L-1/18/2010-CERC dated 12 April 2017, which was published in the Gazette of India, Extraordinary, Part III, Section 4, S.No. 148, dated 19.4.2017.

At page 7, line 16 of that notification, the words and figures "Regulation 6.4.2(c)" are to be read as "Regulations 6.4.2(b)"; at page 7, line 33, "Regulation 6.5.3.19" is to be read as "Regulation 6.5.19" (p1). Nothing else in the parent notification is touched.

The corrigendum does not name the instrument it corrects, so it can be matched only by notification number and date. It is signed by the Secretary, Sanoj Kumar Jha (p1).

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document