Framework for Resource Adequacy Regulations, 2026 — Statement of Reasons
Uttarakhand Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2026
Statement of reasonsDated 10 Sep 2026
The commission's reasons for a regulation not yet published on Voltaic.
Summary
Summary written by software, from pages 1 to 33 of 51. Check the regulator's original before you rely on it.
This is the Uttarakhand Electricity Regulatory Commission's Statement of Reasons for the UERC (Framework for Resource Adequacy) Regulations, 2026, dated 10 September 2026 (p1). It records the comments received on the draft regulations, the Commission's reasoning, and the changes made in the final text. It states that if the Statement of Reasons and the notified Regulations differ, the Regulations prevail (p1), and it refers to Annexure-I listing stakeholders who submitted comments (p1).
Section 5 goes regulation by regulation. Scope was changed to cover generating companies, distribution licensees, SLDC, STU, transmission licensees and other grid-connected entities, with an annual data-timeline order foreshadowed (p2). Definitions were revised for capacity credit and long/medium-term periods; OTC platform was defined by reference to CERC Power Market Regulations, while proposals to define banking and mandate an OTC route for banking were rejected (p3–5). Demand assessment and forecasting must now be at State periphery, scenarios were renamed optimistic/BAU/pessimistic, load research becomes annual, and the Commission-approved loss trajectory becomes primary for energy forecasting (p5–13). DSM accounts remain due by 21 April; distribution licensee forecasts go to SLDC by 30 April; SLDC aggregates State-level long/medium/short-term forecasts and submits them by 31 May; a standalone State-demand clause is deleted (p15–18).
Later sections cover resource mapping, capacity-credit methodology for solar and thermal resources, planning reserve margin, resource adequacy plans and their approval timeline, procurement planning and contract mix, least-cost modelling, mandatory storage contracting, deletion of a separate short-term procurement clause, and prior approval for PPAs/PSAs (p18–33).
Read with this
The regulation itself is not yet published on Voltaic.
No other documents to read with it are on Voltaic.
5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft, 1 draft or notice on a draft not held as English text and 1 main regulation.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.