HPERC · Himachal Pradesh Electricity Regulatory Commission
Demand Side Management Regulations, 2011
Himachal Pradesh Electricity Regulatory Commission (Demand Side Management) Regulations, 2011
RegulationDated 30 Sep 2011F.No.HPERC/437 (VI) dated 30th September, 2011
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Himachal Pradesh Electricity Regulatory Commission issued these Demand Side Management Regulations on 30 September 2011 (p1). They are a principal regulation made under the Electricity Act 2003 and apply to every distribution licensee in Himachal Pradesh in its area of supply (p1). They come into force from the date of publication in the Rajpatra, Himachal Pradesh — the Gazette date is not printed in the document (p1). Regulation 2 defines DSM as measures beyond the consumer's meter that alter end-use electricity, and defines related terms such as baseline data, DSM Master Plan, DSM Programme, DSM Resource Acquisition, load research, EM&V, ESCOs and the State Designated Agency (p2–3). Regulation 3 states objectives: embedding DSM in day-to-day licensee operations; strategic energy conservation, load shifting, power factor correction and time-of-use tariffs; implementing State Government DSM measures; and consistency with Bureau of Energy Efficiency national DSM plans (p3–4).
The Commission sets annual DSM targets in consultation with the licensee, using technical potential assessed in the DSM Master Plan (p4). Each licensee must prepare a draft DSM Master Plan within six months and submit it for approval; the plan is initially for five years and must cover demand forecasting, load research, baseline data, energy audits, DSM options, cost-benefit analysis, pricing, financing, prioritisation, targets, institutional arrangements and barriers (p4–5). A DSM Cell must be constituted within three months, with functions including load research, programme formulation, approvals, implementation, liaison with the State Designated Agency, monitoring and EM&V (p5).
Regulation 7 requires an annual DSM programme, first due within six months of Master Plan approval, submitted to the Commission along with the Yearly ARR; it must contain programme description, EM&V, implementation plan, savings estimates, funding, cost-effectiveness, cost recovery, dispute resolution, monitoring and reporting, and training/awareness elements (p5–8). The Commission approves the annual programme with the ARR and may direct modifications, giving reasonable notice (p8). Regulations 9–13 cover cost recovery through tariff or another mechanism, implementation, monitoring and reporting, EM&V (using approved protocols until Commission guidelines are issued), and phase-wise completion reports (p9–10). Regulations 14–15 authorise the Commission to issue orders, circulars and practice directions and to remove difficulties (p10).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.