MERC · Maharashtra Electricity Regulatory Commission

P-One Techpark SEZ Specific Conditions of Distribution Licence Regulations, 2023 — Statement of Reasons

Maharashtra Electricity Regulatory Commission (Specific Conditions of Distribution License applicable to P-One Techpark Pvt. Ltd. for IT & ITeS SEZ at Rajiv Gandhi Infotech Park, MIDC, Hinjewadi Phase III, Pune) Regulations, 2023

Statement of reasonsDated 12 Jun 2023

The commission's reasons for the Specific Conditions of Distribution License for P-One IT & ITeS SEZ, 2023 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is MERC's Statement of Reasons for finalising the Specific Conditions of Distribution Licence Regulations, 2023 applicable to P-One Techpark Pvt. Ltd. as the deemed distribution licensee for its IT & ITeS SEZ at Hinjewadi Phase III, Pune. It is a short reasoning and consultation record rather than an operative instrument: the licence conditions themselves — term of licence, area of licence and other conditions — are only described, not reproduced (p1).

Pages 1–2 set out the background. The Ministry of Commerce and Industry approved P-One as co-developer of the SEZ; the Electricity Act, 2003 amendment notified on 3 March 2010 makes an SEZ co-developer a deemed distribution licensee; and MERC's order of 6 October 2022 in Case No. 91 of 2022 recorded that status, leaving the specific licence conditions to be specified separately (p1). Draft regulations were published for comment through newspaper notices on 28 February 2023 and on the Commission's website, with comments due 30 March 2023 (p1).

Only P-One responded. It flagged two errors in the Marathi translated draft — another distribution licensee's name appearing in the definition clause and an incorrect map appended — which the Commission treats as non-substantive corrections and incorporates (p1–2).

The substantive point is clause 4.3 (p2–3). As drafted, a deemed licensee facing SEZ notification/de-notification, suspension or termination of its co-developer status, or lease expiry must approach the Commission promptly for amendment of the specific conditions and for directions on interim supply. Responding to a comment from AEMLSEEPZ Ltd. (ASL) on its own parallel draft containing the identical clause, MERC inserted "revocation/repeal", so the licensee now seeks amendment or revocation/repeal of the specific conditions and directions on interim supply. The original and revised clause texts are quoted in full (p2–3). MERC states that no other change is required in the English version, that the Marathi changes are only the corrections plus this clause change, and that the draft is finalised accordingly (p3). It is signed by the Chairperson and two Members (p3).

Standard name
Licensing Regulations
Primary topics
Licensing and licence conditions

Read with this

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document