Skip to content

CERC · Central Electricity Regulatory Commission

Tariff Filing Forms (Transmission & Communication System) for Determination of Tariff — Part-III, Annexure-I

TARIFF FILING FORMS (TRANSMISSION& COMMUNICATION SYSTEM) FOR DETERMINATION OF TARIFF PART-III Annexure-I

RegulationDate not stated

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 55 of 64. Check the regulator's original before you rely on it.

This is Part-III, Annexure-I of the CERC tariff filing forms for transmission and communication systems — a set of template forms, checklists and instructions that a transmission licensee must use to file a tariff petition or true-up for the 2024-29 control period (p1, p5, p11). The index at pp2-4 lists the forms and supporting documents, including loan agreements, BPTA/TSA/PPA, DPR, CPM/PERT charts, justification for cost and time overruns, and requires electronic filing in Word/Excel plus pen drive (p4). The early forms summarise tariff and asset-level cost (pp5-6), describe transmission lines, substations and communication assets and claim O&M (pp7-10), and prescribe the table for normative parameters (p11). A distinct block sets out the methodology for consolidating existing assets, computing effective COD and weighted-average useful life for a single AFC (pp12-14). Capital cost is covered through formats for cost statements, CWIP, new-project estimates, element-wise cost break-up, construction/supply/service packages and asset lists (pp15-29). Later forms cover actual cash expenditure and financial package (p30), additional capitalisation and its financing (pp31-34), return on equity (pp35-38), loan details, foreign loans/hedging and interest on normative loan (pp39-47), depreciation/de-capitalisation and working capital (pp48-52), time overrun (p53) and IEDC/IDC and financing charges (pp54-55). The forms repeatedly cross-refer to the 2024 Tariff Regulations, including Regulations 18(3), 24-26 and 30-31, and to depreciation schedules; they do not themselves set the substantive numbers. The index shows further forms 13-15 and Form A still to come.

Standard name
Tariff Regulations
Primary topics
Transmission tariff, Tariff determination, Capital cost and investment

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document