Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Micro-Grid Renewable Energy Generation and Supply Regulations, 2016

MPERC (Micro-Grid Renewable Energy Generation and Supply) Regulations, 2016

RegulationDated 2 Sep 2016No. 1439/MPERC /2016 dated 02.09.2016

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The MPERC (Micro-Grid Renewable Energy Generation and Supply) Regulations, 2016 — Notification No. 1439/MPERC/2016 dated 02.09.2016, headed "Notified on 09.09.2016" (p1) — create a framework for stand-alone renewable micro-grids in rural Madhya Pradesh where the distribution licensee's network does not exist. They apply statewide to new and existing micro-grid projects of 10 kW and above, with existing projects given six months from notification to comply with the technical standards and safety measures (p3).

Regulations 1–2 give commencement, statewide application and a definition set covering the micro-grid operator, micro-grid area, primary distribution network, feed-in tariff, distribution franchisee and grid arrival (p1–3). Part B sets the business model: the operator supplies consumers at a mutually agreed tariff while the grid is absent, and on grid arrival sells its entire output to the distribution licensee at a Commission-determined FiT, transferring ownership of the primary distribution network at book value verified by a third-party valuer (p3).

Parts C and D specify the technical and operational framework — CEA safety and metering standards, interconnection standards to be issued by the State Nodal Agency, who bears metering and interconnection cost, and the option for the operator to act as a distribution franchisee under a DFA (p4–5).

Parts E and F cover the commercial and contractual side: energy accounting and billing for consumer supply, supply to the licensee and franchisee activity; RPO eligibility of micro-grid generation and the REC mechanism; PPAs; revocation and exit (p5–6).

Part G assigns duties to the State Nodal Agency (MPUVNL), the distribution licensee, the operator and micro-grid consumers (p6–7). Part H covers payment security and ARR treatment, a state-level technical committee, grievance redressal, implementation guidelines to be framed by the distribution licensee within three months and approved by the Commission, and the Commission's powers to direct, relax, remove difficulties and amend (p8–9).

Standard name
Mini-grid and Micro-grid
Primary topics
Mini-grid and micro-grid, Rural electrification, Renewable energy tariff

Read with this

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document