DERC · Delhi Electricity Regulatory Commission
Forum and Ombudsman Regulations, 2024 — Second Corrigendum
Corrigendum – Forum and Ombudsman Regulations, 2024 (second)
CorrigendumDated 3 Sep 2024Published in the Gazette 4 Sep 2024No. F.11(2203)/DERC/2023-24/8014/997. dated 3rd September, 2024
Corrects the CGRF and Ombudsman Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page corrigendum (p2) issued by the Delhi Electricity Regulatory Commission correcting its own Delhi Electricity Regulatory Commission (Guidelines for establishment of the Forum and the Ombudsman for redressal of grievances of Electricity Consumers) Regulations, 2024, notified by Delhi Gazette Notification dated 24.06.2024, NCTD No. 78. The Commission states that discrepancies were noticed in those Regulations and sets out nine numbered corrections (p2).
Five of the nine are numeric fixes: a figure appearing in Regulations 23, 44 and 52 is lowered by one wherever it occurs, the figure in Regulation 29 is lowered by one, and figures in Regulation 60 are substituted. Four are textual: a prioritisation phrase is struck from Regulation 30 with the word 'and' repositioned before 'the gist'; 'for passing the Final Order' is struck from Regulation 31(h); 'of the Forum' is struck from Regulation 45; 'monthly' is struck from 'said Monthly Reports' in Regulation 69. Regulation 53 replaces 'reappointment' with 'during the period of extension', and Regulation 65's 'pass' becomes 'be' in the English version only. Signed by the Secretary (p2). No in-force clause, savings or revised consolidated text is given.
Read with this
The regulation
- Dated 24 Jun 2024CGRF and Ombudsman Regulations, 2024
Amendments and corrections
- Dated 19 Jul 2024Forum and Ombudsman Regulations, 2024 — Corrigendum
Earlier drafts
- Dated 12 Mar 2024Forum and Ombudsman for Redressal of Consumer Grievances Regulations, 2024
- Dated 12 Mar 2024Public notice: Draft Forum and Ombudsman for Consumer Grievance Redressal Regulations, 2024 — Public Notice
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.