MERC · Maharashtra Electricity Regulatory Commission
Draft Recruitment and Conditions of Service of Employees Regulations, 2024 — Explanatory Memorandum
EXPLANATORY MEMORANDUM ON Draft Maharashtra Electricity Regulatory Commission (Recruitment and Conditions of Service of Employees) Regulations, 2024
Explanatory memorandum to a draftDated 6 Mar 2024
Draft
The draft has since been finalised as the Recruitment and Conditions of Service of Employees Regulations, 2024.
Explanatory memorandum to a draft that is not on Voltaic.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a two-page explanatory memorandum issued by the Maharashtra Electricity Regulatory Commission on 6 March 2024 (p1), published alongside the *draft* MERC (Recruitment and Conditions of Service of Employees) Regulations, 2024. It explains why the Commission is rewriting its own staff rules and invites comments on the draft.
Paragraphs 1–2 set out the problem and the process (p1–2). After more than twenty years, MERC's small sanctioned cadre left little room for promotion, changed assignments or higher responsibility. The Commission appointed a one-man committee under Shri K. P. Bakshi IAS (Retd.) to propose a human resource policy; it has accepted that report and its clarification. The memorandum lists the report's main recommendations: raising the sanctioned staff strength from 63 to 81 to match growing responsibilities under the Electricity Act 2003; introducing 'functional' and 'non-functional' promotions; grouping staff into five functional levels (Level I to Level V) within which non-functional promotions may be given subject to a ceiling on posts per level; redesignating certain single posts so that every employee has a promotional avenue; and laying down the procedure for promotions and for the Assured Career Progression (ACP) scheme (p1–2).
Paragraph 3 states that the draft Regulations translate these recommendations and give the Commission flexibility to adapt to technological change, and that they will replace the 2007 Recruitment and Conditions of Service Regulations and their 2011 amendment (p2). Paragraph 4 records that the draft is published for stakeholder comments as required by the Electricity (Procedure for Previous Publication) Rules, 2005 (p2).
Read with this
The regulation
- Dated 25 Sep 2024Recruitment and Conditions of Service of Employees Regulations, 2024
Commencement notices and reasons
2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.