Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Planning, Procurement, Deployment and Utilisation of Battery Energy Storage Systems (BESS) Regulations, 2025 — Draft

Andhra Pradesh Electricity Regulatory Commission [Planning, Procurement, Deployment, and Utilisation of Battery Energy Storage Systems (BESS)] Regulations, 2025

Draft regulationDated 30 Jun 2025

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the draft of APERC's framework regulation for battery energy storage in Andhra Pradesh, issued from Kurnool on 30 June 2025 over the Commission Secretary's signature. It takes effect from publication in the Andhra Pradesh Gazette, a date the text does not print (p3, p15). The preamble traces the mandate to the Electricity Act's efficiency and competition provisions, the Ministry of Power's March 2022 BESS procurement guidelines, the National Framework for Energy Storage Systems of August 2023, and the Andhra Pradesh Integrated Clean Energy Policy, 2024 — whose renewable and storage capacity targets the State government asked the Commission to operationalise by letter under section 108 (p1–3). The regulation is made under section 181(2)(zp) read with sections 61, 66 and 86(1)(e) (p3).

Chapters 1 to 3 give the title, commencement, applicability and a long definitions chapter covering aggregators, ancillary-service classes, banking, firm and dispatchable RE power and un-requisitioned surplus, followed by the regulation's objectives (p3–8).

Chapters 4 and 5 deal with ownership and planning: who may own BESS, the permitted configurations (co-located, standalone, embedded, behind-the-meter), the rule that a storage system carries the legal status of its owner, siting driven by reverse power flow, preference for co-location, a minimum project size threshold, and prior Commission approval for licensee capacity procurement (p8–10).

Chapters 6 to 9 make BESS eligible for frequency regulation, reserves, voltage support and black start; provide for aggregator registration with SLDC and commercial agreements; and set the tariff route — Commission-determined tariffs for licensee-owned assets, adoption of competitive-bidding tariffs for procurement, and market-linked compensation for market services (p10–11).

Chapters 10 and 11 route technical standards, data reporting, safety, cybersecurity and end-of-life environmental obligations to CEA, MNRE, MeitY, MoP, SPCB and MoEF&CC instruments (p11).

Chapters 12 to 18 allocate roles: distribution licensees publish 11 kV BESS sites and fold BESS into resource plans and MYT filings; APTRANSCO prepares a standard ancillary-services agreement format; APSLDC as Nodal Agency verifies governor settings, estimates SRAS/TRAS needs per DISCOM area and day-ahead, registers resources, prepares scheduling, metering, accounting and settlement procedures, and monitors state of charge and round-trip efficiency; RE developers may co-locate or join bidding or the CERC ancillary market; consumers and prosumers outside net metering may install behind-the-meter storage with intimation and CEA-compliant connectivity; open access and banking follow the 2024 Green Energy Open Access regulation; and the Commission approves capacities, tariffs, procedures and formats and monitors compliance (p11–14).

Chapters 19 to 22 are the standard powers to give directions, relax, amend and remove difficulties (p14–15).

Standard name
Energy Storage
Primary topics
Energy storage deployment, Ancillary services and reserves, Tariff determination

Read with this

Voltaic holds no final regulation made from this draft.

No other documents to read with it are on Voltaic.

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document