Skip to content

AERC · Assam Electricity Regulatory Commission

Demand Side Management Regulations, 2012

Assam Electricity Regulatory Commission (Demand Side Management) Regulations, 2012

RegulationDated 31 Mar 2012No. AERC.24/2011 dated The 31st March, 2012

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

These are the Assam Electricity Regulatory Commission's Demand Side Management Regulations, notified on 31 March 2012 under s.181(2)(zp) of the Electricity Act 2003 (p1). They apply to Distribution Licensees in the State within their areas of supply and take effect from publication in the Assam Gazette, a date the document does not print (p1).

Chapters I and II set the frame. Definitions cover DSM itself — action by the licensee beyond the customer's meter to alter end-use of electricity — plus baseline data, the Bureau of Energy Efficiency, Energy Service Companies, DSM Resource Acquisition, cost effectiveness index, and evaluation/measurement/verification (p2). The Commission is to formulate DSM objectives (shortage mitigation, peak reduction, cost-effective savings, emission reduction) and may align them with BEE's national plans; it also sets per-licensee DSM targets, taking the licensee's assessed technical potential into account (p2–3). The licensee must assess DSM technical potential one year before each MYT control period, with a first assessment within six months of notification (p2–3).

The operative machinery sits in Chapters III–V. Each licensee must set up a DSM Cell within one month of adoption, with defined roles from load research through implementation (p3). Chapter IV lays out the DSM process: load and market research and baseline development (which need not precede the first programmes), a perspective DSM Plan due within a year, annual rolling plans alongside the Annual Performance Review, Commission approval of the plan at least six months before the next MYT period, separate Programme Documents per programme, prior Commission approval before implementation, cost recovery of net incremental costs through tariff or another mechanism subject to three qualifying conditions, six-monthly progress reporting, programme completion reports within a month of completion, and third-party evaluation/measurement/verification (p4–6).

Chapter VI lets the Commission grant incentives for meeting or exceeding DSM objectives; Chapter VII contains difficulty-removal, orders and directions, inherent powers, amendment, and interpretation clauses (p6–7). Much of the detail — cost effectiveness, monitoring and reporting, EM&V methodology — is deferred to guidelines the Commission is to issue later, and issuing them is expressly not a precondition to the first DSM plan (p3).

Standard name
Demand Side Management and Demand Response
Primary topics
Demand-side management and demand response

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of AERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document