MERC · Maharashtra Electricity Regulatory Commission
Specific Conditions of Distribution Licence (Newfound Properties and Leasing) Regulations, 2018
Maharashtra Electricity Regulatory Commission (Specific Conditions of Distribution Licence applicable to M/s. Newfound Properties and Leasing Pvt. Ltd. for IT and ITES SEZ at MIDC Trans-Thane Creek Industrial Area, District Thane), Regulations, 2018.
RegulationDated 6 Apr 2018Published in the Gazette 7 Apr 2018MERC/TEC/Licence Conditions/NPL/2018/0443 dated 6th April 2018
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a MERC regulation laying down the licence conditions specific to a single deemed distribution licensee — M/s. Newfound Properties and Leasing Pvt. Ltd. (NPL) — for the IT and ITES SEZ at MIDC Trans-Thane Creek Industrial Area, Thane. It was issued as No. MERC/TEC/Licence Conditions/NPL/2018/0443, signed on 6 April 2018 and published in the Maharashtra Government Gazette (Extraordinary) of 7 April 2018, from which date it comes into force (p3–5).
Regulations 1–5 build the framework: short title, extent tied to the Central SEZ notifications, commencement, the defined terms (Act, Developer, Deemed Distribution Licensee, General Conditions, SEZ Act, SEZ Rules), applicability, the area of supply, and the term of the licence. The area of supply is fixed at the whole of the 19.50 hectare SEZ area, as delineated in the map at Schedule 1; the licence term is twenty-five years running from the 2008 SEZ notification date. Where future SEZ notifications or de-notifications change the area, NPL must approach the Commission within a stated period for amendment, and must keep supplying consumers in a de-notified area until alternative supply is arranged (p4–5).
Regulations 6–9 are the residual provisions: public inspection of the conditions and licence, a duty to provide round-the-clock uninterrupted supply, and the Commission's powers to amend the regulations and to remove difficulties by order (p5).
The Specific Conditions operate together with the 2006 General Conditions of Distribution Licence, which are deemed jointly to constitute NPL's licence conditions (p4). Schedule 1 (p6) is the area map.
Read with this
Commencement notices and reasons
4 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.