RERC · Rajasthan Electricity Regulatory Commission
Framing of Codes for Power System Regulations, 2002
Rajasthan Electricity Regulatory Commission (Framing of Codes for power system) Regulations, 2002
RegulationDated 21 Nov 2002No./Secy/RERC/Reg./11 dated November 21,2002
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Rajasthan Electricity Regulatory Commission's notification of 21 November 2002 (p1) is the framework instrument that says which power-system codes must exist in the State and how they are to be made. It applies to every code framed by the Commission or by a licensee for regulating and operating the State's power system (p1, cl.2).
Clause 4(1) lists the eight codes to be framed — Distribution Code, General Conditions of Supply & Scale of Miscellaneous Charges, Metering Code, Safety Code, Load Dispatch & System Operation Code, Grid Code, Standards of Performance and Charter of Consumer Rights — and marks which licensee each is meant for (p1). Clause 4(2) sets the process: the Commission may call for a draft from the licensee, invite comments and objections from interested persons, and finalise the code in whatever manner it deems fit (p1–2). Clause 4(3) reserves a general power to issue any other code needed for any aspect of the power sector (p2). Clause 3 adopts the definitions of the 1999 Reforms Act rather than defining terms itself (p1). Commencement is on Gazette publication, but no Gazette date is printed (p1).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.