Chapter 3 of a tariff regulation sets out how generation tariffs are computed for thermal and hydro generating stations over the 2009–14 tariff period (p3). Clause 14 splits tariff into capacity charge and energy charge; for thermal, energy charge recovers primary fuel and limestone costs, while for hydro both components derive from annual fixed cost (p1). Clause 15 lists the annual fixed cost components — return on equity, interest on loan, depreciation, interest on working capital, O&M, secondary fuel oil cost for coal stations, and special/compensation allowance (p1).
Clauses 16–21 build each annual fixed cost component. Clause 16 sets return on equity on a pre-tax base rate grossed up for tax, with an additional return for projects meeting COD timelines in Appendix-II, true-up against actual tax rates, and a formula plus illustration (p2–3). Clause 17 computes interest on normative loan, ties repayment to depreciation from the first year of commercial operation, uses weighted average actual loan interest, and provides for sharing refinancing gains and dispute settlement under the KERC (General and Conduct of Proceedings) Regulations, 2000 (p3–4). Clause 18 sets depreciation on capital cost admitted, salvage value, straight-line rates in Appendix-III, and exclusion of certain land (p5–6). Clause 19 defines working capital components separately for coal, gas and hydro stations, with fuel stock, receivables, maintenance spares, O&M and SBI PLR-linked interest (p6–8). Clause 20 prescribes normative O&M expense tables for coal and gas by unit size and year, a compensation allowance by age of coal station, and a hydro O&M derivation and escalation method (p8–11). Clause 21 gives the formula for secondary fuel oil expense, annual fuel-price adjustment and sharing of savings (p11–12).
Clauses 22–23 give the monthly capacity and energy charge formulae. For thermal stations, clause 22 covers AFC recovery, plant availability factor computation, a fuel-shortage scheduling facility, energy charge rate formulae for coal and gas, and fuel/limestone landed cost including transit losses (p12–16). For hydro, clause 23 covers capacity charge, ECR based on design energy, treatment of energy shortfalls, a cap on ECR for excess energy, and scheduling by the Load Despatch Centre (p16–19). Clause 24 leaves unscheduled interchange charges to separate Commission regulations (p19).
Read with this
No other documents to read with it are on Voltaic.
2 more documents belong here and are not on Voltaic: 2 procedures or orders made under it not held as English text.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.