TNERC · Tamil Nadu Electricity Regulatory Commission
Recovery of Expenses and Charges by Licensees and System Operator Regulations, 2026 — Draft
Tamil Nadu Electricity Regulatory Commission(Recovery of Expenses and Charges by Licensees and System Operator) Regulations, 2026
Draft regulationDated 1 Jun 2026TNERC/REC/2026/....... dated 01-06-2026
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is a draft TNERC regulation issued with a draft notification dated 01-06-2026; comments are invited by 18-06-2026, and the regulations are to come into force on publication in the Tamil Nadu Government Gazette, a date not printed (p1, p5). Its stated object is to consolidate the Commission's scattered recovery framework for distribution licensees, transmission licensees and the SLDC, superseding inconsistent earlier instruments while saving prior agreements and pending matters (p5–7, p108–109).
Chapter 1 sets the title, commencement, application and savings, and defines the working vocabulary — deposit contribution works, development charges, dedicated lines, prosumers, distributed generation, wind existing and incremental capacity, repowering, and the Schedule of Charges (p5–13). It applies to existing and future licensees, the STU, SLDC, applicants, consumers, generators, renewable developers, prosumers and other users of the intra-State system (p5).
Chapter 2 governs distribution-side recovery. It lays down general principles — reasonableness, transparency, cost causation, non-discrimination, no recovery without Commission approval, and no duplication with ARR/tariffs — and specifies the charge heads the distribution licensee may recover: development charges, service-line and dedicated-infrastructure costs, supervision, metering, temporary supply, shifting, restoration and prosumer integration (p14–21, p37–39). It then provides a detailed regime for distribution deposit contribution works, applicant-executed works with deemed approval, estimates and demand notices, reconciliation and refunds, withdrawal of applications, restoration after permanent disconnection, same-premises dues recovery, and accounting of consumer contributions (p21–39). Rates and norms are left to a Commission-approved Schedule of Charges (p15, p77–79).
Chapter 3 mirrors this for transmission: general recovery principles, deposit contribution works, connectivity and evacuation infrastructure, system-study and processing charges, estimation and reconciliation, applicant-executed works, payment, withdrawal, maintenance and treatment of recovered amounts (p40–59). It adds special procedural and estimation rules for shifting underground EHV cables, and requires a Commission-approved cost-sharing methodology before demanding shared augmentation costs from individual applicants (p43–47).
Chapter 4 sets the framework for SLDC and system-operation charges: permissible charge heads, recovery principles, system studies and grid-support charges, registration and coordination charges, and preservation of DSM and open-access methodologies (p60–63). It keeps existing SLDC charges in force until the SLDC Fees and Charges Regulations, 2026 commence (p60–61).
Chapter 5 clarifies the open-access interface: existing transmission, wheeling, cross-subsidy, additional surcharge, DSM and SLDC charges continue under their own regulations; open-access users may bear additional infrastructure, study and coordination charges only if non-duplicative, and dedicated infrastructure later shared by others attracts a sharing or refund mechanism (p64–67).
Chapter 6 creates a wind-repowering chapter. It defines existing and incremental wind capacity, limits fresh connectivity, evacuation or augmentation charges on existing capacity where existing infrastructure is reused, provides for aggregation and common evacuation with proportionate cost allocation, and creates an enabling — not self-executing — route for a policy facilitation fee, which requires Commission approval and must be ring-fenced outside the licensee's ARR (p68–76).
Chapter 7 contains general provisions on formats, the Schedule of Charges, transparency, grievance redressal, removal of difficulties, relaxation, directions, interpretation, savings and overriding effect (p77–84). The annexures supply standard estimate and reconciliation formats, model distribution DCW categories and charge heads, principles for dismantling, salvage and restoration, and non-binding worked examples for wind repowering (p86–107). The Statement of Reasons explains the consolidation rationale and the policy choices, especially the treatment of wind repowering and the policy facilitation fee (p108–113).
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.