Skip to content

AERC · Assam Electricity Regulatory Commission

Forecasting, Scheduling, Deviation Settlement Regulations, 2018

AERC Forecasting, Scheduling, Deviation Settlement Regulations, 2018

RegulationDated 6 Sep 2018Published in the Gazette 5 Oct 2018

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Page 1 carries the Assam Gazette masthead — Extraordinary, published by the authority, issue No. 488, Dispur, Friday 5 October 2018 (13 Asvina 1940 S.E.) — followed by the headings 'Government of Assam', 'Orders by the Governor', 'Assam Electricity Regulatory Commission' and 'NOTIFICATION', dated 6 September 2018 (p1). Page 14 carries the signature block of S. K. Roy, Secretary, Assam Electricity Regulatory Commission (p14).

Those pages would carry the operative provisions, definitions, schedules, formats and any repeal or commencement clause. As a result the substance, scope, obligations and applicability of this notification cannot be read from this document.

Standard name
Forecasting, Scheduling and DSM for Wind and Solar

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of AERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document