Skip to content

KERC · Karnataka Electricity Regulatory Commission

Generation Tariff Regulations, 2009 — Chapter 6 Miscellaneous

CHAPTER-6 MISCELLANEOUS

RegulationDate not stated

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is an extract of Chapter 6, 'Miscellaneous', from an electricity tariff regulation. It contains the residual clauses that follow the main tariff methodology. Clause 36 (p1) sets a formula for sharing carbon-credit proceeds from an approved CDM project between the project developer and beneficiaries, moving from full developer retention to equal sharing. Clause 37 (p1) makes the operating norms in the regulation ceiling norms and allows the generating company and beneficiaries to agree improved norms, which then apply for tariff determination. Clause 38 (p1–2) allows tariff on deviated norms only if the levelised tariff over the project life is no higher than under the prescribed norms and the Commission approves; the discounting factor is to be notified by CERC.

Clause 39 (p2) bars recovery of tax on income from beneficiaries, subject to a proviso for deferred tax liability up to 31 March 2009 excluding Fringe Benefit Tax. Clause 40 (p2–3) deals with hedging foreign-exchange exposure on foreign-currency loans and recovering hedging cost and extra rupee liability. Clause 41 (p3) permits direct recovery of hedging and foreign-exchange variation cost without an application, with beneficiary objections going to the Commission. Clause 42 (p3) lets the Commission allow direct recovery of application filing fees and publication expenses. Clause 44 (p3) gives the Commission power to relax provisions, and clause 45 (p3) power to remove difficulties. Clause 43 is missing.

Standard name
Generation Tariff Regulations
Primary topics
Tariff determination, Sharing of CDM / carbon-credit proceeds, Return, financing and working capital

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document