Promotion of Renewable Energy through Green Energy Open Access Regulations, 2023

Odisha Electricity Regulatory Commission (Promotion of Renewable Energy through Green Energy Open Access) Regulations, 2023

RegulationDated 27 Dec 2023Published in the Gazette 11 Jan 2024No. DIR (T)-419/2023/1907 dated The 27th December, 2023

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is OERC's principal regulation for promoting renewable energy through green energy open access in Odisha, notified on 27 December 2023 and published in the Odisha Gazette on 11 January 2024 (p1). It extends to the whole State and applies exclusively to green energy open access consumers within Odisha, notwithstanding the OERC Intra-State Open Access Regulations, 2020 (p1).

Chapter 1 (pp1–9) contains the preliminary provisions. It sets the objective — promoting green energy open access, banking, and green hydrogen/green ammonia production (p1); defines central terms such as banking, green energy, green hydrogen/ammonia, obligated entity, green open access consumer and state nodal agency (pp2–5); and states applicability to generation, purchase and consumption of green energy, including non-fossil-fuel waste-to-energy (p5). Regulation 5 lists the routes by which any entity may procure renewable energy, including own generation, open access, requisition from DISCOM/GRIDCO, captive generation, RECs, and purchase of green hydrogen/ammonia, with RPO accounting and monthly energy accounting rules (pp5–7). Regulations 6–8 establish eligibility — consumers with contracted demand or sanctioned load of one hundred (100) kW or more, with no load limit for captive consumers — and set the nodal-agency and application procedure for short-, medium- and long-term open access, including approval timelines, priority for non-fossil generation and long-term access, speaking orders, and appeals to the Commission (pp7–9). Regulation 9 permits consumer green-energy ratings and Regulation 10 adopts Ministry of Power specifications for green hydrogen measurement (p9).

Chapter 2 (pp10–16) specifies the charges payable by green energy open access consumers: transmission charges, wheeling charges, cross-subsidy and additional surcharge, standby charges, banking charges, and other SLDC/scheduling/deviation charges. It sets out how each is determined, exemptions/concessions to be approved in tariff orders, standby conditions, and a detailed banking framework — banking cycle, drawal restrictions, quantum caps, deemed purchase of unutilised banked energy, and settlement through special energy meters (pp10–15) — followed by a worked illustration table for banking charges (pp15–16).

Chapter 3 (p17) is miscellaneous: Commission powers to issue directions, relax provisions, amend regulations and remove difficulties. The regulation is signed by the Secretary, OERC (p17).

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Open access charges, Energy banking

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of OERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document