UERC · Uttarakhand Electricity Regulatory Commission
Intra-State Open Access Regulations, 2015 — Statement of Reasons
Uttarakhand Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) Regulations 2015 — Statement of Reasons (SOR)
Statement of reasonsDate not stated
The commission's reasons for a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is UERC's Statement of Reasons for the 2015 Intra-State Open Access Regulations. It explains how the Commission finalized changes after stakeholder comments and a hearing held on 24.11.2014, and it records that the 2010 Open Access Regulations were in force without amendment and that open access consumers in Uttarakhand had been increasing (p1). The document is not the notified regulation itself; it walks through selected regulations, reproduces stakeholder suggestions, gives the Commission's reasons, and sets out amended clause text where a change was accepted.
The opening sections deal with definitions: Approved Capacity, Imbalance, Short-term Open Access and Stranded Transmission/distribution capacity. The Commission rejects suggestions to remove the point-of-injection basis, include power exchanges in approvals, extend short-term open access to two months, or widen stranded capacity to cover failure to use augmented systems (pp1–3). It then covers connectivity to transmission and distribution systems, processing timelines, application fees, eligibility for open access, and the application procedure. Eligibility is defined for consumers having a contracted load of 100 kVA and above and connected at 11 kV or above, with feeder and dues-related conditions (pp5–8). Later sections address short-term open access applications, formats and congestion checking by SLDC (pp10–11).
A large middle portion covers embedded open access energy settlement and charges: adjustment of energy in 15-minute blocks, transmission and wheeling charge formulas, part-day slabs, dedicated-system costs, and the exemption from wheeling charges for consumers connected at 132 kV and above following an ATE order (pp12–18). It then takes up SLDC charges, cross-subsidy surcharge, additional surcharge, standby charges, scheduling, metering, imbalance charges and payment security. Throughout, the Commission explains why it accepted or rejected stakeholder suggestions, and it cites CERC regulations, the State Grid Code, the Electricity Act 2003 and APTEL/ATE orders as reference points (pp19–28).
Read with this
Voltaic does not hold the regulation itself.
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.