Intra-State Open Access Regulations, 2015 — Statement of Reasons

Uttarakhand Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) Regulations 2015 — Statement of Reasons (SOR)

Statement of reasonsDate not stated

The commission's reasons for a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is UERC's Statement of Reasons for the 2015 Intra-State Open Access Regulations. It explains how the Commission finalized changes after stakeholder comments and a hearing held on 24.11.2014, and it records that the 2010 Open Access Regulations were in force without amendment and that open access consumers in Uttarakhand had been increasing (p1). The document is not the notified regulation itself; it walks through selected regulations, reproduces stakeholder suggestions, gives the Commission's reasons, and sets out amended clause text where a change was accepted.

The opening sections deal with definitions: Approved Capacity, Imbalance, Short-term Open Access and Stranded Transmission/distribution capacity. The Commission rejects suggestions to remove the point-of-injection basis, include power exchanges in approvals, extend short-term open access to two months, or widen stranded capacity to cover failure to use augmented systems (pp1–3). It then covers connectivity to transmission and distribution systems, processing timelines, application fees, eligibility for open access, and the application procedure. Eligibility is defined for consumers having a contracted load of 100 kVA and above and connected at 11 kV or above, with feeder and dues-related conditions (pp5–8). Later sections address short-term open access applications, formats and congestion checking by SLDC (pp10–11).

A large middle portion covers embedded open access energy settlement and charges: adjustment of energy in 15-minute blocks, transmission and wheeling charge formulas, part-day slabs, dedicated-system costs, and the exemption from wheeling charges for consumers connected at 132 kV and above following an ATE order (pp12–18). It then takes up SLDC charges, cross-subsidy surcharge, additional surcharge, standby charges, scheduling, metering, imbalance charges and payment security. Throughout, the Commission explains why it accepted or rejected stakeholder suggestions, and it cites CERC regulations, the State Grid Code, the Electricity Act 2003 and APTEL/ATE orders as reference points (pp19–28).

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Connectivity and GNA

Read with this

Voltaic does not hold the regulation itself.

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document