KERC · Karnataka Electricity Regulatory Commission
Revised Draft Karnataka Captive Status Verification Regulations, 2024
Karnataka Electricity Regulatory Commission (Verification of captive status of generating plants/consumers in the State of Karnataka) Regulations, 2024
Draft regulationDated 22 Mar 2024No: KERC/Group Captive/CT-2/2023-24/Vol-III/1521 dated 22.03.2024
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Karnataka Electricity Regulatory Commission has issued a revised draft of the KERC (Verification of Captive Status of Generating Plants/Consumers in the State of Karnataka) Regulations, 2024, notified vide No. KERC/Group Captive/CT-2/2023-24/Vol-III/1521 dated 22.03.2024 (p1). It replaces an earlier draft published in the Official Gazette on 6 October 2023, on which objections were invited on 12.10.2023, and responds to the Supreme Court's order of 09.10.2023 in Dakshin Gujarat Vij Company Ltd v. Gayatri Shakti Paper and Board Ltd (p3). The draft is open for objections for 30 days from Gazette publication and will be finalised thereafter (p3). It invokes the Commission's jurisdiction under s.42 of the Electricity Act 2003 and the ATE's 2010 ruling in the Hira Ferro Alloys matter (pp1-3).
The draft regulations apply to all generating plants and consumers in Karnataka claiming captive status (p4). They set out definitions (pp4-5); annual verification of captive status after each financial year based on shareholding and consumption (p6); the types of captive users and documents they must file (pp7-8); the ownership, consumption and proportional-share tests for single, co-operative and group captive users (pp8-9); the process and timing for submitting data to distribution licensees and the Commission, including within 15 days of shareholding changes (pp9-10); net generation and loss grossing-up rules (p11); metering and portal requirements (pp11-12); the treatment of one defaulting group-captive shareholder (p12); the security-deposit and surcharge consequences of failing the tests (pp12-13); dispute resolution before the Commission (p13); and the Commission's powers to remove difficulties, amend and interpret the regulations (p13). Annexure-I and its sheets give the formats for generating units, equity holding, generation and consumption data (pp14-16).
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.