Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Conduct of Business Regulations, 2024 — Amendment, 2025

Himachal Pradesh Electricity Regulatory Commission (Conduct of Business) (Amendment) Regulations, 2025

AmendmentDated 10 Sep 2025No. HPERC/151-Vol-III-2081 dated Shimla the 10th September, 2025

Amends the Conduct of Business Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-page amendment by the Himachal Pradesh Electricity Regulatory Commission to its own Conduct of Business Regulations, 2024, notified at Shimla on 10 September 2025 after previous publication (p1). It comes into force on the date of publication in the Rajpatra, Himachal Pradesh, which is not printed in the text (p1).

The substance is a shift of decision-making language from the Chairperson to the Commission. Clause 2 inserts "and includes the Chairperson" into the definition in Regulation 2(e) of the Principal Regulations, so that references to the Commission carry the Chairperson with them (p1). Clause 3 replaces "Chairperson" with "Commission" in Regulation 6(3), and clause 4 does the same throughout Regulations 7, 8 and 14, while renumbering clauses (a) to (f) of Regulation 7(2) as (a) to (g) (p1). Clause 5 drops the words "of the Commission" from Regulation 19(7) and from the proviso to Regulation 19(10) (p1).

Clause 6 adds a new Sr. No. 21 to the Schedule to the Principal Regulations, after the existing Sr. No. 20 — but the content of that entry is not reproduced in the text supplied, which stops at the signature block of the Secretary (p2). For an analyst, the document matters only as a housekeeping change to the Commission's internal conduct of business, not to any licensee's obligations.

Standard name
Conduct of Business Regulations

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document