Skip to content

TERC · Tripura Electricity Regulatory Commission

Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources Regulations, 2016

TERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2016

RegulationPublished in the Gazette 18 Nov 2016

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on terc.tripura.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A Tripura Gazette extraordinary issue (p1) carrying the Tripura Electricity Regulatory Commission's framework for integrating solar and wind generation into the State grid, published at Agartala on 18 November 2016. The PDF bundles three things: the operative regulations, two appendices of settlement mechanics, and the Commission's Statement of Reasons (SoR) with its own appendix.

The regulations open with definitions (pp2–4): error is expressed as a percentage of Available Capacity (AvC), and the text defines deviation, gaming, pooling station, State Entity, time-block and the Qualified Coordinating Agency (QCA) — an aggregator that schedules, meters, settles and de-pools on behalf of generators at a pooling station and is treated as a State Entity.

Part 2 (pp5–6) requires wind and solar generators, or their QCA, to file day-ahead (96 time-block) and week-ahead schedules, either on the SLDC's forecast or their own; schedules may be revised on advance notice effective from the fourth time block, capped at 16 revisions a day; telemetry formats and procedure go into a Detailed Procedure prepared by SLDC and approved by the Commission.

Part 3 (pp6–8) handles the commercial side: generators selling within the State are paid on actual generation and those selling outside on schedule; deviation charges for shortfall or excess flow to the State DSM Pool by graded error bands (Table-I, p7); the QCA de-pools energy and charges by actual units or available capacity; the State keeps separate time-block records; all RE generators are to be treated as a virtual pool; SLDC prepares annual accounts and may approach PSDF/NCEF for a deficit.

Part 4 (p8) gives the Commission power to relax provisions and to issue directions.

Appendix I (pp9–11) gives the parallel framework for generators selling outside the State, settled at the PPA rate (s.62 determined or s.63 adopted; APPC for open access and captive), with monthly netting and REC balancing done by SLDC. Appendix II (pp12–14) covers metering (SEMs complying with the CEA meter regulations, 2006), energy accounting, and a two-stage deviation settlement — transitional, then long-term on CERC DSM lines.

The SoR (pp16–31) explains the design: QCA aggregation, turbine/inverter-level telemetry, forecasting with error measured against AvC rather than schedule, scheduling flexibility, tolerance-band deviation charges differentiated for 'existing' and 'new' generators by commercial operation date relative to the notification date, an IEGC-based justification for SLDC control over generators selling out of State, and metering/accounting proposals. It directs staff to prepare the regulations by 1 April 2016 and flags national fund support till 31 March 2019. Its appendix (pp31–32) gives a graded PPA-rate-based deviation formula for outside-State sales and applies the national APPC rate to open access and captive plants.

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy accounting and settlement

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read TERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of TERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on terc.tripura.gov.in ↗

Report an issue with this document