Skip to content

UPERC · Uttar Pradesh Electricity Regulatory Commission

Generation Tariff Regulations, 2019 — First Amendment, 2022

Uttar Pradesh Electricity Regulatory Commission (Terms and Conditions of Generation Tariff) (First Amendment) Regulations, 2022

AmendmentDated 31 Aug 2022UPERC/Secy./Regulation/2022-370 dated August 31, 2022

Replaced by a later regulation not yet published on Voltaic

Voltaic does not show the regulation that replaces it, so check the regulator's website for it.

Amends a regulation not yet published on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on uperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Uttar Pradesh Electricity Regulatory Commission's first amendment to its 2019 Generation Tariff Regulations, issued from Lucknow on 31 August 2022 as Notification No. UPERC/Secy./Regulation/2022-370 (p4). It is made under sections 181 and 61 of the Electricity Act, 2003 and comes into force only on publication in the UP Government Gazette — no Gazette date is printed (p4). It amends the principal regulations notified on 11.09.2019 and touches just two provisions.

Part (A) replaces Regulation 24(i) on Return on Equity (p4–5). The 15% annual return and the treatment of share premium and internal reserves as paid-up capital are restated, but the operative additions are provisos: the rate of return for a new project may be cut by up to 1% for a period the Commission decides where the station is declared under commercial operation without RGMO/FGMO, data telemetry, communication up to the load dispatch centre or protection systems, on an SLDC report; the same reduction may be applied to an existing station found lacking; and a generating company that misses the window for filing its final tariff petition — 90 days from the audited accounts of the COD year, or 180 days from determination of capital cost, whichever is later — faces a 0.25% per month reduction in return on equity, without prejudice to other penalties under the 2003 Act and the UPERC (Fees & Fines) Regulations, 2010.

Part (B) replaces Regulation 16(2) on truing up of capital expenditure and tariff for 2019–24 (p5). The 30.11.2024 filing deadline is retained, with a new proviso: if the truing-up application and documents are late, no carrying cost or interest is allowed on the under-recovered amount, while any over-recovered surplus is recovered with carrying cost under Regulation 16(4).

Standard name
Generation Tariff Regulations
Primary topics
Return, financing and working capital, ARR and true-up, Grid operation and grid code

Read with this

The regulation itself is not yet published on Voltaic.

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a main regulation not held as English text.

Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on uperc.org ↗

Report an issue with this document