UPERC · Uttar Pradesh Electricity Regulatory Commission
Generation Tariff Regulations, 2019 — First Amendment, 2022
Uttar Pradesh Electricity Regulatory Commission (Terms and Conditions of Generation Tariff) (First Amendment) Regulations, 2022
AmendmentDated 31 Aug 2022UPERC/Secy./Regulation/2022-370 dated August 31, 2022
Replaced by a later regulation not yet published on Voltaic
Voltaic does not show the regulation that replaces it, so check the regulator's website for it.
Amends a regulation not yet published on Voltaic.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Uttar Pradesh Electricity Regulatory Commission's first amendment to its 2019 Generation Tariff Regulations, issued from Lucknow on 31 August 2022 as Notification No. UPERC/Secy./Regulation/2022-370 (p4). It is made under sections 181 and 61 of the Electricity Act, 2003 and comes into force only on publication in the UP Government Gazette — no Gazette date is printed (p4). It amends the principal regulations notified on 11.09.2019 and touches just two provisions.
Part (A) replaces Regulation 24(i) on Return on Equity (p4–5). The 15% annual return and the treatment of share premium and internal reserves as paid-up capital are restated, but the operative additions are provisos: the rate of return for a new project may be cut by up to 1% for a period the Commission decides where the station is declared under commercial operation without RGMO/FGMO, data telemetry, communication up to the load dispatch centre or protection systems, on an SLDC report; the same reduction may be applied to an existing station found lacking; and a generating company that misses the window for filing its final tariff petition — 90 days from the audited accounts of the COD year, or 180 days from determination of capital cost, whichever is later — faces a 0.25% per month reduction in return on equity, without prejudice to other penalties under the 2003 Act and the UPERC (Fees & Fines) Regulations, 2010.
Part (B) replaces Regulation 16(2) on truing up of capital expenditure and tariff for 2019–24 (p5). The 30.11.2024 filing deadline is retained, with a new proviso: if the truing-up application and documents are late, no carrying cost or interest is allowed on the under-recovered amount, while any over-recovered surplus is recovered with carrying cost under Regulation 16(4).
Read with this
The regulation itself is not yet published on Voltaic.
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a main regulation not held as English text.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.