Skip to content

CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff Regulations, 2009 — Appendix-III, Depreciation Schedule

Appendix-III — Depreciation Schedule

RegulationDate not stated

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a bare extract of Appendix-III, "Depreciation Schedule" — a two-page asset-wise rate table (p1–2) and nothing else. There is no title clause, preamble, notification number, date or named issuer anywhere in the text, so the parent instrument it is annexed to cannot be identified from this document alone.

Page 1 opens the schedule with land (full ownership and lease), then assets purchased new broken down by generation technology, cooling towers and circulating water systems, dams and hydraulic works, buildings and roads, transformers and switchgear (p1). Page 2 continues the alphabetical list: lightning arrestors, batteries, cables and duct systems, transmission lines by support type and voltage, meters, vehicles, air-conditioning plant, office furniture and equipment, internal wiring, street-light fittings, apparatus let on hire, communication equipment and IT equipment, closing with a residual catch-all for any asset not covered above (p2).

Each row carries a depreciation rate expressed as a percentage, with the asset classes grouped into a small number of rate levels — from full write-off for temporary structures to nil for land held in full ownership. An analyst looking for the rate applicable to a particular asset class should go straight to the relevant row; the schedule's function is to prescribe depreciation for capital-cost recovery in tariff computation.

Standard name
Tariff Regulations
Primary topics
Return, financing and working capital

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document