JSERC · Jharkhand State Electricity Regulatory Commission
Operation of Parallel Licensees Regulations, 2019
Jharkhand State Electricity Regulatory Commission (Operation of Parallel Licensees) Regulations, 2019
RegulationDated 21 Feb 2019Published in the Gazette 26 Feb 2019Notification No. 66-- dated 21 February, 2019
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the JSERC's principal regulation for areas of Jharkhand where more than one distribution licensee operates, allowing a consumer to buy electricity from a licensee of its choice while the wires of the area stay shared. The preamble (p1–2) anchors it in the Electricity Act 2003 — competition, choice to consumers, and s.14's permission for two or more distribution licensees in the same area — and Chapter I (p2–5) gives the short title, commencement on Gazette publication, scope limited to common areas, and a long definition set that turns on the distinction between a "Changeover" (consumer switches supplier but stays on the existing licensee's wires) and a "Switchover" (consumer moves onto the other licensee's wires).
Chapter II (p6–16) is the operative core. A5 creates a State level and an Area level Co-ordination Committee, with nomination within one month of notification and committee-formatted rules, procedures and application forms to be submitted to the Commission within sixty days; the Area committee is also the first forum for disputes and for fixing meter testing and specifications. A6 bars licensees from erecting criteria that favour or deter switching. A7 (7.1–7.17) is the procedural spine: consumer information and application handling (p7), pre-changeover/switchover steps including inspection, meter choice, security deposit and a bar on reversal for a year (p8), joint meter reading, final billing and refund timelines at the changeover date (p9–10), meter reading, energy accounting and monthly settlement certified by SLDC (p10), billing and collection (p10–11), wheeling charges payable within thirty days (p11), disconnection for non-payment (p11), customer interface, theft inspection, Standards of Performance and security deposit (p11–13), tariff treatment including a distinct methodology for Changeover consumers and a ban on cross-subsidy, additional or regulatory surcharge on switched/changed-over consumers (p13–14), network development and dispute redressal (p14–15). Chapter III (p16) gives the Commission power to remove difficulties, amend, and a savings clause preserving its inherent powers.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.