Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Grant of Trading Licence and Other Matters of Trading Licensee (Including Deemed Licensee) Regulations, 2025 (Revision-I)

Madhya Pradesh Electricity Regulatory Commission {Procedure, Terms and Conditions for Grant of Trading Licence and Other Matters of Trading Licensee (Including Deemed Licensee)} Regulations, 2025 (Revision –I) {RG-18 (I) of 2025}

RegulationDated 12 Aug 2025No. 1643/MPERC/2025 dated 12/08/2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

MPERC's Intra-State Trading Licence Regulations, 2025 (Revision-I) (p1) replace Madhya Pradesh's 2004 licensing framework for electricity traders. Made under ss.14–19 and 52 read with s.181 of the Electricity Act 2003, they are notified on 22/08/2025 (Bhopal, dated 12/08/2025) and take effect from publication in the MP Official Gazette — a date the document itself does not print (p1).

Chapter 1 sets the short title, application and definitions. Scope is intra-state trading in Madhya Pradesh, with two carve-outs: a distribution licensee needs no trading licence, and a CERC inter-state licence lets a trader operate intra-state without a separate MP licence (p1). Chapter 2 (pp4–12) is the licensing gateway: general qualifications tied to the applicant's constitutional documents, technical staffing requirements, and a category-based capital adequacy regime in which proposed annual trading volume fixes the minimum net worth, supported by current and liquidity ratio tests, credit-standing screens and a list of disqualifications (including holding a transmission licence). It then sets the application procedure — format, fees, supporting documents, public inspection, newspaper advertisement, objection window, hearing, and the Commission's own second public notice before grant — plus licence deposit and display duties.

Chapter 3 (pp12–15) sets the general conditions and obligations: agreements, billing and settlement arrangements, payment security, coordination with SLDC/STU/CEA, category migration and net-worth top-ups, separate accounts, no abuse of dominant position, limits on encumbrance, licence transfer and related-party dealing, a website disclosure duty, and a 25-year licence term with automatic 25-year renewals. Deemed licensees are bound by the general conditions (p15). Chapter 4 (pp15–16) prescribes regulatory accounting and interim/annual financial reporting with auditors' reports.

Chapters 5–8 (pp17–20) cover information and reporting (including quarterly trade returns verified by MP SLDC), the annual licence fee and consequences of late payment, revocation of licence after enquiry and notice, and amendment of licence conditions. Chapter 9 makes violation penal under s.142 of the Act and s.31 of the MP Act (p20); Chapter 10 (pp20–24) sets the compliance-enforcement procedure, dispute resolution and arbitration under s.86(1)(f), trading margin (left to later determination), standards of performance, imbalance settlement, communication rules, powers to relax and remove difficulty, and repeal of the 2004 regulations with savings for existing licences. Formats 1–5 (pp25–34) supply the application, information, amendment, quarterly-trade and performance-return forms.

Standard name
Licensing Regulations
Primary topics
Licensing and licence conditions, Electricity trading and trading margin, Fees payable to the Commission

Read with this

Other copies of these documents (1)

2 more documents belong here and are not on Voltaic: 1 commencement notice or statement of reasons not held as English text and 1 copy in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document