Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Terms and Conditions for Tariff Determination for Wind Power Projects, 2015

Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions for Tariff determination for Wind Power Projects) Regulations, 2015

RegulationDated 31 Jul 2015Published in the Gazette 31 Jul 2015Regulation No. 1/2015 dated 31st July, 2015

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Andhra Pradesh Electricity Regulatory Commission made this regulation under sections 61 and 86 read with section 181 of the Electricity Act 2003 to fix the norms on which it will determine tariffs for wind power projects selling to distribution licensees in the State (p1, p4). Published in the AP Extraordinary Gazette on 31 July 2015 and in force from that date, it is a norms-only instrument: it does not itself announce a tariff. Instead the Commission must notify a generic preferential tariff on its own motion at the beginning of each year of the tariff period, with the FY2015-16 tariff to follow soon after gazette publication and apply from the date the regulations came into force (p5).

Regulations 1 to 3 give the short title, commencement and life of the regulation (in force up to 31 March 2020 unless reviewed or extended) and set out definitions and scope: wind projects commissioned in Andhra Pradesh after notification, generating and selling wholly or partly to State distribution licensees, where tariff is determined by the Commission under section 62 read with section 86 (p1–4).

Chapter 1 (Regulations 4–9) carries the general principles: the control period ending 31 March 2020 with a first stub year running to the end of FY2015-16; a tariff period equal to the project's useful life counted from commercial operation; the single-part tariff structure of return on equity, loan interest, depreciation, working capital interest and O&M; the levellised-tariff method discounted at the weighted average cost of capital; and MUST RUN status exempting wind plants from merit order despatch, with scheduling under IEGC 2010 / APSEGC for plants 10 MW and above connected at 33 kV and above (p4–7).

Chapter 2 (Regulations 10–20) sets the financial norms: base capital cost and the WPI-linked indexation formula carried over from the CERC RE Tariff Regulations 2012, debt-equity ratio, loan tenure and interest benchmark, depreciation, return on equity, working capital composition and interest, O&M expenses with annual escalation, payment rebates, sharing of CDM carbon-credit proceeds between developer and beneficiaries, treatment of taxes and duties (including MAT/income tax and electricity duty as pass-through), and the treatment of government subsidy or accelerated depreciation benefits in tariff determination (p7–13).

Chapter 3 (Regulation 21) gives the technology-specific parameter, the capacity utilisation factor for the control period (p13). Chapter 4 (Regulations 22–27) covers departures from the norms, power to relax, issue of orders and practice directions, power to amend, removal of difficulties, and application of the Commission's evacuation guidelines and previously approved model PPAs to projects set up after these regulations take effect (p14–15).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Tariff determination, Renewable energy tariff, Capital cost and investment

Read with this

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of APERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document