Summary written by software, from pages 1 to 26 of 85. Check the regulator's original before you rely on it.
The document is the Bihar Electricity Regulatory Commission (Multi Year Distribution Tariff) Regulations, 2021, notified in the Bihar Gazette on 25 January 2022 (notification dated 17 November 2021) (p1). It is made under the Electricity Act, 2003, s.181(1) and s.181(2)(zd)–(zf), read with ss.61, 62 and 86, and applies to all distribution licensees in Bihar (p1). It comes into force from Gazette notification and applies to cost-based/ARR-based tariff determination from 1 April 2022 up to FY 2024-25 or until amended; the proviso identifies the control period as 2022-23 to 2024-25 (p1, p5, p9). Business plan filing is waived for that control period, with requirements folded into the MYT petition (p5, p9).
Part I (pp1–4) covers short title, commencement, extent and scope, and defines core terms such as ARR, AT&C losses, control period, licensed business, wheeling and non-tariff income. Part II (pp4–9) establishes the multi-year tariff framework: the Commission approves a business plan, forecast ARR and revenue, performance trajectories for specified variables, annual review and true-up. It distinguishes controllable and uncontrollable factors and prescribes pass-through for uncontrollable gains/losses and a sharing formula for controllable gains/losses, with special treatment where state resource-gap grants or other incentive regulations apply. Part III (pp9–12) sets the procedure and deadlines for business plan and tariff applications, admission, public notice, tariff order within 120 days, publication of approved tariffs, true-up and annual performance review, and consequences for non-compliance.
Part IV (pp12–20) governs sales forecast, unmetered sales studies, the overhaul exercise, AT&C loss treatment and computation, power purchase quantum and cost, and incremental power procurement cost through the FPPCA formula. It includes a detailed AT&C methodology and illustration, and terms for monthly FPPCA recovery, including a ceiling and minimum levy. Part V (pp20–26) sets financial principles for ARR: components; O&M expense norms and escalation; depreciation; contingency reserve; loan and finance charges; interest during construction and incidental expenditure during construction; working capital; return on equity; bad debts; and tax on return on equity. Later parts, schedules and the 41 formats referenced at p9 are not available.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.