Skip to content

OERC · Odisha Electricity Regulatory Commission

TPCODL Licence Conditions, 2020

The Licence conditions of TP Central Odisha Distribution Limited (TPCODL)

RegulationDated 24 Aug 2020In force from 1 Jun 2020No. OERC/Engg./19/2005 (Vol.-III)/994 dated 24.08.2020

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software, from pages 1 to 33 of 43. Check the regulator's original before you rely on it.

This is an OERC order dated 24.08.2020 that gives effect to the sale of the CESU distribution utility and transfers the CESU distribution licence to TP Central Odisha Distribution Limited (TPCODL), attaching the licence conditions that will apply to TPCODL. Pages 1–5 set out the background: the 1999 CESCO licence, deemed-licensee status under the Electricity Act 2003, revocation of the CESCO licence in 2005, the 2006 Central Electricity Supply Utility of Orissa (Operation and Management) Scheme, the 2017 RFP and 2018 Tata Power bid, the Vesting Order of 26.05.2020, and delivery of the utility to TPCODL on 01.06.2020. The Commission says the CESU licence conditions of 27.10.2006, as amended by this order, become TPCODL’s licence conditions; the licence runs 25 years from 01.06.2020 unless revoked earlier. It directs TPCODL to publish the conditions and a public notice, and says the Commission will finally decide any conflict between the licence conditions, the Vesting Order and the RFP documents.

Pages 6–12 begin the licence text. Part I covers the short title, the area of supply (five distribution circles, excluding defence and cantonment places), definitions, and the terms of the licence, including its 25-year term, amendability and non-exclusivity. Pages 13–33 set out Part II General Conditions. These specify compliance with law and despatch-centre directions; the licensee’s functions, including power procurement, franchisees, trading, open access, related-party dealings and asset transfers; separate accounts and financial reporting; prohibition of undue preference; information and major-incident reporting; a business plan; investment approval, with threshold matters left to Specific Conditions; restrictions on transferring assets or creating charges; licence fees; suspension and revocation; amendment procedure; dispute resolution; compliance with the Odisha Grid Code and distribution codes; consumer service obligations (billing code, complaint handling, consumer rights statement, GRF/Ombudsman); and distribution planning, security and operating standards. Specific Conditions and later parts are not included.

Standard name
Licensing Regulations
Primary topics
Licensing and licence conditions, Conditions of supply, Distribution system planning and operation

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of OERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document