OERC · Odisha Electricity Regulatory Commission
TPCODL Licence Conditions, 2020
The Licence conditions of TP Central Odisha Distribution Limited (TPCODL)
RegulationDated 24 Aug 2020In force from 1 Jun 2020No. OERC/Engg./19/2005 (Vol.-III)/994 dated 24.08.2020
Summary
Summary written by software, from pages 1 to 33 of 43. Check the regulator's original before you rely on it.
This is an OERC order dated 24.08.2020 that gives effect to the sale of the CESU distribution utility and transfers the CESU distribution licence to TP Central Odisha Distribution Limited (TPCODL), attaching the licence conditions that will apply to TPCODL. Pages 1–5 set out the background: the 1999 CESCO licence, deemed-licensee status under the Electricity Act 2003, revocation of the CESCO licence in 2005, the 2006 Central Electricity Supply Utility of Orissa (Operation and Management) Scheme, the 2017 RFP and 2018 Tata Power bid, the Vesting Order of 26.05.2020, and delivery of the utility to TPCODL on 01.06.2020. The Commission says the CESU licence conditions of 27.10.2006, as amended by this order, become TPCODL’s licence conditions; the licence runs 25 years from 01.06.2020 unless revoked earlier. It directs TPCODL to publish the conditions and a public notice, and says the Commission will finally decide any conflict between the licence conditions, the Vesting Order and the RFP documents.
Pages 6–12 begin the licence text. Part I covers the short title, the area of supply (five distribution circles, excluding defence and cantonment places), definitions, and the terms of the licence, including its 25-year term, amendability and non-exclusivity. Pages 13–33 set out Part II General Conditions. These specify compliance with law and despatch-centre directions; the licensee’s functions, including power procurement, franchisees, trading, open access, related-party dealings and asset transfers; separate accounts and financial reporting; prohibition of undue preference; information and major-incident reporting; a business plan; investment approval, with threshold matters left to Specific Conditions; restrictions on transferring assets or creating charges; licence fees; suspension and revocation; amendment procedure; dispute resolution; compliance with the Odisha Grid Code and distribution codes; consumer service obligations (billing code, complaint handling, consumer rights statement, GRF/Ombudsman); and distribution planning, security and operating standards. Specific Conditions and later parts are not included.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of OERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.