Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2022 — 3rd Amendment, 2023

Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) (3rd Amendment) Regulations, 2023.

AmendmentDated 6 Dec 2023Published in the Gazette 7 Dec 2023No. PSERC/Secy/Regu./183 dated The 6th December, 2023

Replaced by a later regulation Voltaic does not hold

Voltaic does not show the regulation that replaces it, so check the regulator's website for it.

Amends a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the third amendment to PSERC's 2022 tariff regulations — the terms and conditions on which generation, transmission, wheeling and retail supply tariffs are determined in Punjab. It was notified on 6 December 2023 and comes into force on gazette publication, 7 December 2023 (p1).

Only three substantive changes are made. Regulation 9, on the business plan and capital investment plan, gains a new clause 9.20 (p1): prudent costs a distribution licensee incurs in creating distribution-system assets under section 42(1) of the Electricity Act are to be passed through, but only if the asset falls within a Commission-approved capex roll-out plan, was procured competitively and transparently, and is geo-tagged and recorded in the fixed asset register.

Regulation 44, on power purchase, procurement process and cost, is amended twice (p2): the cross-reference to the 2011 Renewable Purchase Obligation Regulations is replaced by the 2022 ones, and a new clause 44.4 makes prudent power procurement costs pass-through where incurred to ensure 24x7 supply under the Electricity (Rights of Consumers) Rules, 2020 and to meet PSPCL's Resource Adequacy plan under the Electricity (Amendment) Rules, 2022 — provided procurement was transparent or the price was Commission-approved.

A new provision on subsidy from the State Government is inserted (p2), although the text as printed cross-refers to Regulation 53 of the PSERC (Conduct of Business) Regulations, 2005 rather than stating its own terms. A closing Note records the Principal Regulations' gazette history and the first two amendments (p2).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Power procurement and PPAs, Capital cost and investment

Read with this

Voltaic does not hold the regulation itself.

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document