GERC · Gujarat Electricity Regulatory Commission
Terms and Conditions of Intra-State Open Access Regulations, 2010 — Draft
Gujarat Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) Regulations, 2010
Draft regulationDated 15 Nov 2010
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is GERC's framework for who may use Gujarat's intra-state transmission and distribution networks under open access, and on what terms. It is made under section 181 of the Electricity Act, 2003 and signed at Ahmedabad on 15/11/2010 (p64), taking effect on publication in the Government Gazette — a date the text does not print (p1).
Chapter 1 sets the title, extent to the whole state, scope (intra-state open access, including where the system is used with the inter-state system) and an extensive definitions list (p1–4). Chapter 2 sets the connectivity gateways: eligibility by consumer load or generating-station capacity, application to the STU or the distribution licensee, non-refundable application fees, interconnection studies under the CEA connectivity regulations, connection and tripartite agreements, dedicated lines, and testing/infirm-power injection before commercial operation (p5–9). Chapter 3 sets eligibility for open access — including the consumer capacity threshold and the captive exemption — disqualifies defaulters, and distinguishes the criteria for long-term access (augmentation considered) from medium- and short-term access (no augmentation solely for them) (p10–11).
Chapter 4 is the procedural core: categories of open access customers, form and nodal agency, two scenario tables of nodal agency, fee, documents, disposal timeline and applicable charges (p12–25), the detailed step-by-step procedures for long-term access, medium-term and short-term open access including advance applications, day-ahead access and electronic bidding when a corridor is congested (p26–36), the STU's obligation to file a publicly consulted 'detailed procedure' for approval, consent timelines with a deemed-consent rule for distribution licensees, summary rejection of defaulters' applications, and allotment priority (p36–40). Chapter 5 sets the charges: transmission charges for LTA/MTOA through sharing of annual transmission charges and for STOA as a fraction of that rate with part-day slabs, SLDC scheduling and system operation charges, wheeling charges derived from the licensee's annual revenue requirement, cross-subsidy surcharge on the Tariff Policy formula, additional surcharge where the licensee's power purchase is stranded, and standby charges (p41–47).
Chapter 6 covers SLDC scheduling, ABT-compliant special energy meters, schedule revision and loss apportionment in kind (p48–49). Chapter 7 settles deviations — intra-state ABT for larger loads and all generating stations, ToD-meter treatment for small consumers — and reactive energy charges (p50–52). Chapter 8 sets billing, collection and disbursement cycles for inter-state and intra-state transactions, late payment surcharge, default consequences including disconnection and refusal to schedule, and payment security (p53–55). Chapter 9 requires SLDC to publish open access information and report monthly and annually (p56–57). Chapter 10 applies the consumer procedure to generating stations connected to a distribution system, minus cross-subsidy and additional surcharge (p58–59). Chapter 11 deals with relinquishment and under-utilisation compensation, computation of available capacity, curtailment priority, removal of difficulties, and repeal of the 2005 Open Access Regulations with savings (p60–64). Formats ST1–ST4 sit at the end (p65–72).
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.