KSERC · Kerala State Electricity Regulatory Commission
Supply of Power from Captive Generating Plants to Distribution Licensees Regulations, 2007
Kerala State Electricity Regulatory Commission (Supply of Power from Captive Generating Plants to distribution licensees) Regulations, 2007.
RegulationDated 6 Aug 2007No.1/1/KSERC-2006 dated 6 th August,2007
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is KSERC's 2007 regulation governing how captive generating plants in Kerala supply power to distribution licensees and interact with the grid. It opens with a Statement of Objects and Reasons citing the Commission's powers under s.181 read with s.86(1)(a), (b) and (e) of the Electricity Act, 2003 (p1).
Chapter I is general: the short title, commencement and a two-year validity unless reviewed or extended, plus a full set of definitions — banking, captive generating plant, co-generation, dedicated transmission lines, open access, PPA, renewable energy source, wheeling and others (p1–3). Regulation 3 fixes the scope: the regulations apply to captive plants in Kerala, and it restates the qualifying tests a plant must meet to be treated as captive — ownership share and the share of generation consumed by captive users on an annual basis — with separate treatment for co-operative societies, associations of persons and SPV-owned stations, and a consequence if the captive-use threshold is missed (p3–4).
Regulations 4 to 12 are the operative obligations. They require captive plants to follow CEA technical and metering standards, the State Grid Code and SLDC/STU directions, and to submit tariff-related data; they set out transmission and wheeling charges, a concessional treatment for infirm renewable generation, reactive-power drawal charges for wind, and a banking facility for seasonal/infirm plants with charges, a banking period, slot-wise withdrawal rules and treatment of unutilised energy (p4–6). Later regulations cover sale of surplus power (including competitive bidding for firm long/medium-term purchases and Commission approval of PPAs), mutual emergency and backup supply, voltage-wise evacuation and cost responsibility for evacuation lines, maintenance of dedicated lines, ABT-compatible metering, and SLDC energy accounting and billing (p6–8). It closes with the Commission's powers to remove difficulties and to relax any provision (p8).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of KSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.