Skip to content

CERC · Central Electricity Regulatory Commission

Payment of Fees Regulations, 2012 — Statement of Reasons

The Central Electricity Regulatory Commission (Payment of Fees) Regulations, 2012.

Statement of reasonsDate not statedNo.L-7/142/157/2008-CERC

The commission's reasons for the Payment of Fees Regulations, 2012 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Statement of Reasons the Central Electricity Regulatory Commission issued for the CERC (Payment of Fees) Regulations, 2012, which replaced the fee regime in force since 27.10.2008. It records the consultation — draft published on 02.06.2011, comments from 21 stakeholders, a public hearing on 22.7.2011 — and explains, head by head, what the Commission accepted, rejected or modified (p1–2).

Part A answers the general objection that fees were being raised too sharply, arguing that the Commission's functions under the Electricity Act 2003 have expanded, that the fee is regulatory and backed by quid pro quo, and that it would rather meet its expenditure from fees than depend on Central Government grants under s.98 (p2–8).

Part B moves commencement from Gazette publication to 1.4.2012 for budget certainty, and refuses an exemption for generators that had already paid tariff filing fees for 2009-14 (p8–9). Part C recasts the definitions: 'Miscellaneous Petition' becomes 'Miscellaneous Application'; routine periodic reports and returns are carved out of compliance applications, which are renamed 'Regulatory Compliance Application'; and a review petition is defined (p9–11).

The fee heads follow in order. Regulation 3 (tariff determination) keeps the fee but adds an instalment facility through a proviso (p11–15). Regulation 4 fixes the adoption-of-tariff fee under s.63 (p15). Regulation 5 leaves the licence application fee unchanged, no objections having been received (p15–16). Regulation 6 settles fees for miscellaneous, review, interlocutory and regulatory compliance applications, with a table comparing draft and final levels and payment required in one go at filing (p16–18). Regulation 7 covers licence fees for inter-state transmission and trading: CTU's claim that a deemed licensee need not pay is rejected, and the burden is reallocated away from the short-term market after an analysis of contributions from generation, transmission and short-term trade, the revenue loss to be absorbed by economising (p18–24). Regulation 8 restructures power exchange registration charges by turnover slab (p24–27). Regulations 9 to 13, which would have imposed a short-term inter-state transaction fee, are dropped outright as premature, with a commitment to revisit (p27–30).

Standard name
Fees and Fines Regulations
Primary topics
Fees payable to the Commission, Electricity trading and trading margin, Power markets and exchanges

Read with this

The regulation

Amendments and corrections

Other copies of these documents (4)

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document