Terms and Conditions for Open Access Regulations — 3rd Amendment, 2006

Rajasthan electricity Regulatory Commission (Terms and Conditions for open access) (3rd Amendment) Regulation, 2006

RegulationDated 27 Dec 2006No. RERC/ Secy/ Reg/ 58 dated 27th December 2006

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Third Amendment to RERC's Terms and Conditions for Open Access Regulations, notified at Jaipur on 27 December 2006 (p1). It is eleven amending clauses that rewrite named regulations of the principal open access framework; it comes into force from publication in the official Gazette, whose date is not printed in this text (p1).

Clause 2 adds a definition of "open access supplier" to regulation 2, and clause 3 substitutes regulation 12 wholesale, laying out what an Open Access Agreement must contain: a commercial agreement with the supplier (covering premature termination and its consequences), an agreement with RVPN for transmission use, and agreements with the distribution licensee for HT supply and standby supply, with standby admissible only for outages within an aggregate annual cap (p1). It also covers contract demand expressed in kW and kVA, options for existing consumers to reduce contract demand, supplementary agreements for changes, standard formats to be issued separately by the Commission and deemed part of the regulations, HT billing frequency, standby supply at temporary-supply tariff, SLDC's confirmation of the date open access becomes available, and how supply voltage is determined (p1–2).

Clauses 4 to 6 make targeted additions: additional surcharge payable under regulation 16; a proviso on how transmission charges are determined, with a tolerance for excess capacity utilised; and a replacement of the first paragraph of regulation 17(5) governing meter reading, communication of readings to SLDC and the parties, and use of check meters (p2).

Clause 7 builds out regulation 24: injection and drawal scheduling, consumer identification within the injection schedule, priority ranking where one supplier serves several consumers, priority-based and proportional segregation of actual injection, adjustment for inter- and intra-state losses, and outage intimation and restoration timelines (p2–3). Clause 8 replaces regulation 20 with a new Unscheduled Interchange Pricing regime, routing settlement of scheduled-versus-actual mismatch to the RERC (Intra-State ABT) Regulations, 2006 and, for inter-state ABT suppliers, to the CERC (Inter-State OA) Regulations, 2004, setting permissible deviation bands at injection and drawal ends, treating deviation beyond them as inadvertent supply that is neither payable nor bankable, and providing a fallback cascade to HT and standby contracts (p3).

Clauses 9 to 10 address power factor surcharge/incentive allocation and the energy-accounting chain — supplier-end and consumer-end licensees passing meter readings to SLDC, RVPN, supplier and consumer, provisional weekly energy accounts, monthly billing, and metering compliant with CEA meter regulations, with a compliance window for existing consumers (p3–4). Clause 11 replaces regulation 30 with a power for the Commission to remove difficulties (p4).

Standard name
Open Access Regulations
Primary topics
Open access, Deviation settlement (DSM), Open access charges

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document