CERC · Central Electricity Regulatory Commission
Corrigendum dated 29 January 2020
Corrigendum
NotificationDated 29 Jan 2020Published in the Gazette 29 Apr 2016No. L-1/18/2010-CERC dated 29th January, 2020
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page corrigendum issued by the Central Electricity Regulatory Commission on 29 January 2020 (p1). It corrects the text of an earlier CERC notification dated 6.4.2016, published in the Gazette of India, Extraordinary, Part-III, Section 4 at Sr. No. 162 dated 29.4.2016 (p1).
The corrigendum makes only two substitutions, both at page 10 of the original publication: at line 53 the words "a Central Generating Station of" are to be read as "a Central Generation Station or", and at line 54 the word "at" is to be read as "the" (p1).
It carries no operative provisions of its own, no enabling clause, no statement of when it takes effect, and no savings or transitional language. The original instrument being corrected is identified only by its date and gazette reference, not by title (p1). It is signed by the Secretary, Sanoj Kumar Jha (p1).
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.