Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Procedure for Accreditation of a Renewable Generation Project for REC Mechanism Regulations, 2013

West Bengal Electricity Regulatory Commission (Procedure for Accreditation of a Renewable Generation Project for REC Mechanism) Regulations, 2013

RegulationDated 2 Apr 2013Published in the Gazette 2 Apr 2013No. 51/WBERC dated the 2nd April, 2013

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is WBERC's accreditation-side rulebook for the Renewable Energy Certificate mechanism in West Bengal, notified as No. 51/WBERC on 2 April 2013 and published in the Kolkata Gazette the same day; it comes into force from that gazette notification and extends to the whole State (p1).

Regulation 1 gives the title, commencement and extent. Regulation 2 defines the actors and price terms of the REC market — Central Agency, CERC REC Regulations, REC, floor and forbearance price, obligated entity, State Agency, RPO, preferential tariff and the R&C Regulations (p1–2).

Regulation 3 designates SLDC as the State Agency and lists its functions: scrutinising and independently verifying accreditation applications, reviewing completeness and accuracy, recommending registration or giving reasons for rejection, extending and revoking accreditation, notifying the company, Commission, Central Agency, SLDC and the concerned discom, devising an information-collection protocol and reporting quarterly on RPO compliance; it also lets the Commission name a replacement agency (p2–3).

The application stage (unnumbered in the text, p3–4) requires owner, operator, station, connectivity, metering and statutory-clearance details, filed in Forms 1.1 to 1.4 with a signed declaration; Regulation 5 provides the Certificate of Accreditation in Form 2 (p4). Regulation 6 sets the clock and the cure windows — commissioning horizon from application, accreditation on complete information, revalidation before expiry, and updating on change of legal status (p4). Regulation 7 fixes the fee and charge schedule, payment timing and mode (p4). Regulation 8 lists events of default and the notice-then-revocation procedure with intimation deadlines (p5). Regulations 9 and 10 preserve the Commission's power to amend and its general/residual powers (p5). Pages 6–10 carry the application forms and the certificate format.

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Renewable purchase obligation (RPO / RCO)

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document