WBERC · West Bengal Electricity Regulatory Commission
Procedure for Accreditation of a Renewable Generation Project for REC Mechanism Regulations, 2013
West Bengal Electricity Regulatory Commission (Procedure for Accreditation of a Renewable Generation Project for REC Mechanism) Regulations, 2013
RegulationDated 2 Apr 2013Published in the Gazette 2 Apr 2013No. 51/WBERC dated the 2nd April, 2013
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is WBERC's accreditation-side rulebook for the Renewable Energy Certificate mechanism in West Bengal, notified as No. 51/WBERC on 2 April 2013 and published in the Kolkata Gazette the same day; it comes into force from that gazette notification and extends to the whole State (p1).
Regulation 1 gives the title, commencement and extent. Regulation 2 defines the actors and price terms of the REC market — Central Agency, CERC REC Regulations, REC, floor and forbearance price, obligated entity, State Agency, RPO, preferential tariff and the R&C Regulations (p1–2).
Regulation 3 designates SLDC as the State Agency and lists its functions: scrutinising and independently verifying accreditation applications, reviewing completeness and accuracy, recommending registration or giving reasons for rejection, extending and revoking accreditation, notifying the company, Commission, Central Agency, SLDC and the concerned discom, devising an information-collection protocol and reporting quarterly on RPO compliance; it also lets the Commission name a replacement agency (p2–3).
The application stage (unnumbered in the text, p3–4) requires owner, operator, station, connectivity, metering and statutory-clearance details, filed in Forms 1.1 to 1.4 with a signed declaration; Regulation 5 provides the Certificate of Accreditation in Form 2 (p4). Regulation 6 sets the clock and the cure windows — commissioning horizon from application, accreditation on complete information, revalidation before expiry, and updating on change of legal status (p4). Regulation 7 fixes the fee and charge schedule, payment timing and mode (p4). Regulation 8 lists events of default and the notice-then-revocation procedure with intimation deadlines (p5). Regulations 9 and 10 preserve the Commission's power to amend and its general/residual powers (p5). Pages 6–10 carry the application forms and the certificate format.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.