Summary written by software. Check the regulator's original before you rely on it.
This is a public notice and draft of the Odisha Electricity Regulatory Commission's proposed Renewable Consumption Obligation, Distributed Renewable Energy Sources and Renewable Energy Linked Concepts Regulations, 2026. The Commission issued the notice on 10 April 2026 and invited objections and suggestions by 8 May 2026 before final publication in the Official Gazette (p1). The draft regulations would apply across Odisha and come into force from Gazette publication (p2).
Chapter I (pp2–8) contains definitions and interpretation provisions for the new framework, covering terms such as RCO, DRES, prosumer, RESCO, the six metering mechanisms, energy storage, VPP, P2P and V2G.
Chapter II (pp8–13) sets the scope of the Renewable Consumption Obligation. It identifies obligated entities and designated consumers, lists eligible renewable energy sources, provides a year-wise RCO trajectory split into wind, hydro, distributed renewable energy and other renewable energy components (Table 1, p9), and explains how the obligation is calculated for distribution licensees, open access consumers and captive users. It also covers fungibility between components, exclusions, methods of compliance including RECs and storage, the designation of SLDC as State Agency, consequences of non-compliance, and repeal of the 2021 RE procurement regulations with savings.
Chapter III (pp14–26) is the core DRES framework. It covers eligibility, capacity limits, the requirement for hybrid inverters and battery storage above 5 kW, and the six metering mechanisms: net metering, net billing, gross metering, group net metering, virtual net metering and behind the meter. It then prescribes energy accounting and billing rules for each mechanism, applicable charges and exemptions, hosting capacity limits, technical and safety standards, commissioning requirements, and how DRES generation counts towards RCO.
Chapter IV (pp27–28) deals with grid connectivity of RES/DRES, metering infrastructure, subsidies and REC eligibility. Chapter V (pp29–32) introduces new concepts: virtual power plants, peer-to-peer trading, vehicle-to-grid and agrivoltaics, mostly leaving detailed procedures to later Commission action. Miscellaneous provisions (pp32–33) cover overriding effect, directions, powers to remove difficulties, relax and amend, interpretation and inherent powers. Annexure-I (pp34–38) provides RCO compliance reporting forms for distribution licensees and open access/CGP entities.
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.