BERC · Bihar Electricity Regulatory Commission
Notification authorising Junior and Assistant Electrical Engineers to disconnect supply on theft, 2013
Notification regarding authorising Junior Electrical Engineers and Assistant Electrical Engineers for disconnecting the supply line
RegulationDated 31 May 2013Published in the Gazette 3 Jun 2013BERC-Misc-16/13 dated The 31st May 2013
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Bihar Electricity Regulatory Commission issued this gazette notification (No. BERC-Misc-16/13) under s.135(1A) of the Electricity Act 2003 to name the field officers who may themselves disconnect a supply line where theft of electricity is detected (p1).
Junior Electrical Engineers posted in Electricity Supply Sections of North Bihar and South Bihar Power Distribution Companies are authorised within their own jurisdictions, but only for low tension consumers with maximum connected load upto 7KW (p1). Assistant Electrical Engineers posted in the companies' Electricity Supply Sub-divisions, and Assistant Electrical Engineers in the companies' headquarters Task Force, are authorised for their jurisdictions across all categories of consumers and loads (p1–2).
Authorised officers must also lodge a complaint at the jurisdictional police station within 24 hours of the disconnection (p2). The notification is dated 31 May 2013 and was published in the Bihar Gazette Extraordinary of 3 June 2013 (p1).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of BERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.