Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Distribution Licensees' Standards of Performance Regulations, 2005

Himachal Pradesh Electricity Regulatory Commission (Distribution Licensees' Standards of Performance) Regulations, 2005

StandardsDated 31 Oct 2005No. HPERC/ 401

Replaced by Distribution Performance Standards Regulations, 2010

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Himachal Pradesh Electricity Regulatory Commission (Distribution Licensees' Standards of Performance) Regulations, 2005 (Notification No. HPERC/401) is a principal regulation binding all distribution licensees in Himachal Pradesh (p1). It is made under the Electricity Act 2003, principally sections 57, 58, 59 and 86(1)(i), and comes into force from the date of publication in the Rajpatra, Himachal Pradesh, though the Gazette date is not printed (p1). Compensation liability starts on the first day of the month after commencement (p4).

Regulations 1–6 set out title/application/commencement, definitions, objectives, legal provisions, standards and compensation. Schedule I standards are guaranteed minimum service levels; Schedule II standards are management/operational benchmarks modelled on industry practice (p3). If a guaranteed standard is missed, the licensee pays compensation listed in Schedule I without proof of loss, adjustable against bills, with further Commission determination possible; compensation attributed to negligence is not allowed as ARR pass-through (pp3–4). Regulation 7 (p5) describes complaint channels—Forum, Electricity Ombudsman and the Commission—and exclusions for matters sub judice.

Regulations 8–15 (pp6–8) require each operation circle to be a responsibility centre, a head-office control centre, uniform data formats, ranking and monthly monitoring; operational head accountability; quarterly and annual performance/compensation reports; Ombudsman half-yearly reports; Commission monitoring, investigation and enforcement; publication/use of information; force majeure suspension and possible release from compensation liability; and powers to issue directions, remove difficulties and amend schedules. Regulation 16 (p8) repeals the HPSEB-adopted Complaint Handling Mechanism and Procedure (w.e.f. 11.02.2002), preserves prior actions, gives these regulations overriding effect over the 2003 Forum Regulations for distribution licensees, and preserves consumer rights under the Consumer Protection Act 1986.

Schedule I (pp9–19) contains guaranteed standards for call centres, consumer services, efficiency parameters, reliability (SAIDI, SAIFI, CAIFI, CAIDI) and voltage variation/unbalance. Schedule II (pp20–24) contains responsibility-centre performance measures across consumer services, operations, metering/billing/collection, HR, finance and engineering resource management.

Standard name
Standards of Performance
Primary topics
Standards of performance, Power quality, Consumer grievance redressal (CGRF)

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document