OERC · Odisha Electricity Regulatory Commission
Procurement of Energy from Renewable Sources and its Compliance Regulations, 2024 — Draft
Odisha Electricity Regulatory Commission (Procurement of Energy from Renewable Sources and its Compliance) Regulations, 2024
Draft regulationDated 13 Aug 2024No. OERC/DIR(T).– 418/2023/ Vol.- II/______
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is the Odisha Electricity Regulatory Commission's public consultation package for the draft OERC (Procurement of Energy from Renewable Sources and its Compliance) Regulations, 2024. Page 1 is a public notice inviting objections and suggestions on the draft by 13.09.2024 (5.00 p.m.); it states the Commission may modify the draft and publish the final regulation in the official gazette. Pages 2–15 contain the draft notification and regulation text.
The draft regulation would extend to the whole of Odisha and come into force on the date of publication in the Official Gazette (p2). It repeals the OERC (Procurement of Energy from Renewable Sources and its Compliance) Regulations, 2021 on commencement, while preserving actions already taken and existing RE PPAs (pp2, 9, 14). It defines obligated entities and key terms (pp2–5) and applies to distribution licensees/GRIDCO, captive users and open access consumers above the stated capacity threshold, and new coal/lignite thermal generating stations (p5).
Chapter 4 is the core: it lists the ways obligated entities may meet their renewable purchase obligation — own generation, open access, requisition from the distribution licensee/GRIDCO, captive green energy, green hydrogen/ammonia, and RECs — and sets annual RPO trajectories by technology to 2029-30, with notes on which projects qualify for wind, hydro, distributed and other RE components (pp5–8). It also introduces a renewable generation obligation for new coal/lignite stations, an energy storage obligation with an annual storage percentage table, carry-forward and PPA continuity rules, and a special-order route for changes following amendments to the Act, National Tariff Policy or central guidelines (pp8–10).
The remaining chapters cover REC deposit with the State Agency (p10), State Nodal Agency functions including an RPO web-portal, monitoring, verification and reporting (pp10–12), GRIDCO's ARR planning role (p11), captive/open access compliance and reporting (p11), consequences of default including penalties and the RPO Fund (pp12–13), grid connectivity and interconnection responsibilities (pp13–14), and miscellaneous provisions giving the regulation overriding effect plus powers to issue directions, remove difficulties, relax, amend and interpret (pp14–15).
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.