Summary written by software. Check the regulator's original before you rely on it.
This is the draft APERC (The Grid Interactive Solar Rooftop Photovoltaic Systems under Net/Gross Metering) Regulation, 2023, numbered Regulation 4 of 2023 (p1). The Andhra Pradesh Electricity Regulatory Commission proposes it under the Electricity Act, 2003 to replace the earlier Solar Rooftop guidelines and align with the Electricity (Rights of Consumers) Rules, 2020 (p1). It applies to grid-interactive solar rooftop PV systems, with or without battery energy storage, installed in the areas of AP distribution licensees (p2). It comes into force on publication in the Official Gazette; the Gazette date is not printed, and the draft is dated 06.06.2023 (p14).
Regulation 4 makes eligibility broad: registered companies, government entities, partnership firms and individuals, and groups or societies that are AP DISCOM consumers may set up such systems (p5). Regulation 5 sets capacity limits, including a 1 kWp minimum for individual net/gross metering, a 5 kWp minimum for multiple-service and group net metering, and ceilings of 500 kWp for net metering and 5,000 kWp for gross metering, each capped by contracted demand, whichever is less; a voltage-level table maps capacity to LT, HT and EHT connections (p5–7). Cumulative capacity on a distribution transformer or feeder is limited as a proportion of rated capacity, subject to a load-study exception, and DISCOMs must publish headroom periodically (p6–7).
Regulations 6–7 cover interconnection and metering: compliance with CEA connectivity, safety and grid-code regulations, islanding protection, gross meter location, consumer-borne meter costs, DISCOM procurement timelines, testing or NABL certification, and HT main/check meters (p5–8). Regulation 8 sets the feed-in tariff as a proportion of the average pooled power purchase cost depending on net or gross metering, voltage/capacity slab and whether battery storage supports daytime supply, with different applicability periods for domestic and other prosumers (p8–9). Regulations 9–10 address T&D wheeling charges and losses, grid support charges, and MNRE subsidies (p9).
Regulations 11–14 lay out the application-to-commissioning process: application routes and fees, deficiency and acknowledgement formats, technical feasibility study timelines and deemed approval, agreement and installation deadlines, inspection, synchronization and commissioning reporting (p9–12). Regulations 15–18 cover prosumer obligations, monthly energy settlement and billing under net and gross metering, no capacity targets for DISCOMs, and CDM benefit sharing (p12–13). Regulations 19–23 provide for relaxation, practice directions, removal of difficulties, amendment/review, and repeal and savings for projects under earlier guidelines (p14). Annexures I–XIV (p15–44) supply the application, approval, deficiency, agreement, meter-procurement, inspection, work-completion and synchronization formats.
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.