Skip to content

MSERC · Meghalaya State Electricity Regulatory Commission

Tariff Formats dated 16.11.2026

RegulationDated 16 Nov 2026

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is a set of prescribed formats for electricity tariff and annual revenue requirement (ARR) filings, arranged in four blocks. The opening “Common Formats” block (pp1–10) supplies cross-utility forms for operation and maintenance expense, employee cost, administration and general charges, depreciation, fixed assets and accumulated depreciation, and loan registers/weighted-average loan. These establish the line-item granularity and the year columns that the rest of the document reuses.

The “Generation Formats” block (pp11–23) gives station-level forms for the generation ARR, hydro station particulars and normative availability, pondage/storage design energy and peaking capability, month-wise gross generation, plant availability, plant load factor, repair and maintenance expense, and interest on working capital. The hydro orientation is explicit in the station-detail and design-energy forms (pp13–15).

The “Distribution Formats” block (pp24–34) covers the distribution licensee’s ARR, transformer failure reporting, key characteristics of the distribution network, repair and maintenance, consumer-category revenue with LT/HT/EHT categories and tariff components, power purchase from named sources, transmission and distribution losses, circle-wise losses, and working capital.

The “Transmission Formats” block (pp35–44) provides the transmission ARR, repair and maintenance, actual O&M for true-up by line/bay/transformer, substation particulars, transformer failure, transmission losses, transmission availability and working capital.

Across the forms, the columns run from previous years (PY3/PY2/PY1, FY(n-3) to FY(n-1)) through current-year actual and estimated figures (CY, FY(n)) to the control-period years FY(n+1) to FY(n+5). The document repeatedly requires current-year data to be actual for at least six months to September, with the remaining months estimated (pp4, 6, 17–18, 31, 44). It also separates true-up, current-year revised estimate and ARR projections in some formats (pp31, 42). The document does not itself set tariff values or principles; it is a reporting template (pp2–44).

Primary topics
ARR and true-up, Operating costs and other income, Return, financing and working capital

Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mserc.gov.in ↗

Report an issue with this document