CSERC · Chhattisgarh State Electricity Regulatory Commission
Terms and Conditions for Determination of Tariff according to Multi-Year Tariff Principles, 2021
Chhattisgarh State Electricity Regulatory Commission (Terms and Conditions for determination of tariff according to Multi-Year Tariff principles and Methodolory and Procedure for determination of Expected revenue from Tariff and Charges) Regulations, 2021
RegulationDated 14 Nov 2021No. 92/CSERC/2021 dated l4th November 2021
Replaced by Terms and Conditions for Determination of Multi-Year Tariff Regulations, 2025
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software, from pages 1 to 27 of 98. Check the regulator's original before you rely on it.
The Chhattisgarh State Electricity Regulatory Commission issued this principal MYT tariff regulation at Raipur on 14 November 2021 (p2), under Electricity Act 2003 ss.61 and 62 read with s.181(2) and s.32(3) (p2). It sets the framework for determining generation, transmission, distribution-wheeling and retail-supply tariffs, plus SLDC fees and charges, for the control period 1 April 2022 to 31 March 2025 — FY 2022-23 to FY 2024-25 — and remains in force until superseded (p2, p5). It extends to the whole of Chhattisgarh (p2).
Chapter I, Preliminary (p2–14), gives the short title and commencement, scope and application, and definitions. It applies to the STU, intra-state transmission licensees, distribution licensees, SLDC, and generating stations supplying power under long-term agreements to distribution licensees in the State, with exceptions for central-jurisdiction stations and certain renewable stations whose tariff is decided by the Commission (p2–3). It does not apply to stand-alone generators, bulk consumers or captive users, except that stand-alone generators using SLDC services for REC metering/accounting must pay fees and charges (p3). Where the regulation is silent, the Commission is guided by CERC Tariff Regulations 2019 (p3). The definitions cover ARR, ERC, control period, COD, integrated mines, emission control systems, regulated business, controllable/uncontrollable factors and related concepts (p3–14).
Chapter 2, General Principles (p15–23), establishes the MYT framework and procedure. It lists the filing requirements for generation, transmission, SLDC, distribution wires and retail supply; sets pre-control deadlines such as capital investment plan by 31 October 2021 and MYT petitions by 30 November 2021 (p15–18); deals with disposal of petitions, publication, stakeholder objections and tariff orders (p18); requires approval of a capital investment plan for the control period with cost-benefit analysis and prudence check (p18–19); provides for trajectories for controllable variables and chapter-wise tariff determination (p19–20); and sets out annual truing-up, classification of controllable and uncontrollable factors, pass-through and sharing mechanisms, adherence to tariff orders, and the subsidy mechanism (p20–23).
Chapter 3, Financial Principles (p24–27), deals with debt-equity ratio, capital cost and capital structure, interest during construction, incidental expenditure during construction, capitalised initial spares, de-capitalisation and average capital cost. Later chapters — Generation (Chapter 4), Transmission (Chapter 6), Distribution Wheeling (Chapter 7), Retail Supply (Chapter 8) and SLDC (Chapter 9).
Read with this
Amendments and corrections
- Dated 22 Feb 2023Corrigendum in MYT Regulations, 2021
- Dated 10 May 2023MYT (First Amendment) Regulations, 2023
9 more documents belong here and are not on Voltaic: 6 copies in another language, 2 corrigenda and 1 corrigendum not held as English text.
Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.