WBERC · West Bengal Electricity Regulatory Commission
Statement of Reasons for Regulation 65
Statement of reasonsDated 21 Jan 2020
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission's statement of reasons for the West Bengal Electricity Regulatory Commission (Terms and Conditions of Tariff) (Third Amendment) Regulations, 2020, signed by all three members on 21 January 2020 (p43). It records the consultation process, summarises the stakeholder responses and sets out, provision by provision, the Commission's reasoning and the final text of each amendment to the 2011 Principal Regulations.
Pages 1–3 explain why a limited third amendment was chosen: coal is billed on gross calorific value by Coal India, so the UHV conversion should be dropped; the payment timeline for L&MV agriculture consumers should be relaxed to match sowing and harvesting; e-payment rebate and gateway charges need clarity; and new tariff categories are introduced for EV charging infrastructure and for MES and airports under RCS-UDDAN. The background notes the 2011 Regulations, two earlier amendments and an abandoned 2017 draft.
Pages 3–5 deal with Regulation 1. Objections from WBPDCL, CESC and HEL against mid-year applicability moved commencement from 01.10.2019 to 01.04.2020 and changed the title year from 2019 to 2020; ARR, APR, FCA and FPPCA for prior periods remain under the old regulations.
Pages 5–8 define "GCV as received" measured at the unloading point with third-party sampling under IS standards. Pages 8–12 set the delayed payment surcharge regime, with a relaxed slab table for L&MV agriculture consumers and a proviso tying LPSC for disconnected consumers to termination of agreement under the Supply Code Regulations 2013.
Pages 12–36 cover fuel cost and energy charge: landed fuel cost of primary fuel, secondary fuel oil and reagent (5.8.1); components of landed fuel cost and demurrage treatment (5.8.2); transit and handling losses (5.8.3); the storage heat-loss adjustment and the CEA norms behind it (5.8.4(1)); Form D reporting formats D(a)–(e) by fuel source (5.8.4(2), pp19–28); reagent cost (5.8.5); input price of coal from integrated mines (5.8.6); energy charge rate approval and fuel mix (5.8.7); and use of alternative fuel with a prior-consultation threshold aligned to CERC (5.8.7A). Regulation 5.8.15 is deleted (pp36–37).
Pages 37–41 substitute GCV for UHV in two provisions, revise the e-payment rebate (the cap on the extra rebate was dropped after comments), amend the CVPF parameter and add biomass blending in Schedule-1, tidy Schedule-7A and correct CoalGCV in Schedule-7B. Annexure C1 adds three consumer classes — Metro rail/Airport under RCS-UDDAN, MES and EV charging stations — with tariff structure left to the tariff order (pp41–42). Pages 42–43 record additional comments and list the seven stakeholders.
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.