SSERC · Sikkim State Electricity Regulatory Commission
Renewable Energy Tariff Regulations, 2025
Sikkim State Electricity Regulatory Commission (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2025
RegulationDated 22 May 2025Published in the Gazette 2 Jun 2025No: 448/SSERC/2025-26/03 dated 22.05.2025
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the SSERC's principal tariff regulation for renewable energy in Sikkim, notified on 22 May 2025 and published in the Sikkim Government Gazette on 2 June 2025, when it came into force (p1). It replaces the 2012 SSERC RE tariff regulations and their amendments, which stand repealed from commencement (p1). The Commission made it under Sections 61, 66 and 86 read with Section 181 of the Electricity Act, 2003.
Chapter 1 gives the short title, commencement and the repeal. Chapter 2 defines the vocabulary the rest of the instrument runs on — auxiliary consumption, APPC, CUF, control period, date of commissioning, eligible project, interconnection point, useful life (with a technology-wise table), storage, and the several RE project categories (pp2–5) — then sets the scope: the regulations apply where the Commission determines tariff under Section 62 read with Section 86 for RE stations commissioned during the control period, and they set eligibility criteria for wind, small hydro, solar PV, biogas, MSW, RDF, hybrid and storage projects, with Section 63 adoption reserved for larger projects (pp6–7).
The general principles follow: a three-year control period running FY2025-26 to FY2027-28 (p7); tariff periods aligned to useful life (p7); which technologies get generic tariff versus project-specific tariff (pp7–9); the petition and filing requirements (p9); procurement and must-run treatment of RE (p10); tariff structure and levelisation design (pp10–11); and treatment of over-generation (p11).
Chapter 3 sets the financial norms — capital cost, debt-equity, loan tenure and interest, depreciation, return on equity, working capital, O&M escalation, rebate, late payment surcharge, subsidy treatment and statutory charges (pp11–15). Chapters 4–11 then give technology-by-technology parameters and the split between generic and project-specific determination for small hydro, biogas, wind, solar PV, MSW/RDF, hybrid and RE-with-storage (pp15–20). Chapter 12 covers deviation from norms, power to relax, power to remove difficulties and power to amend (p21). Annexed form templates support tariff filings and levelised tariff computation (pp22–28).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of SSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.