Skip to content

SSERC · Sikkim State Electricity Regulatory Commission

Renewable Energy Tariff Regulations, 2025

Sikkim State Electricity Regulatory Commission (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2025

RegulationDated 22 May 2025Published in the Gazette 2 Jun 2025No: 448/SSERC/2025-26/03 dated 22.05.2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on sserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the SSERC's principal tariff regulation for renewable energy in Sikkim, notified on 22 May 2025 and published in the Sikkim Government Gazette on 2 June 2025, when it came into force (p1). It replaces the 2012 SSERC RE tariff regulations and their amendments, which stand repealed from commencement (p1). The Commission made it under Sections 61, 66 and 86 read with Section 181 of the Electricity Act, 2003.

Chapter 1 gives the short title, commencement and the repeal. Chapter 2 defines the vocabulary the rest of the instrument runs on — auxiliary consumption, APPC, CUF, control period, date of commissioning, eligible project, interconnection point, useful life (with a technology-wise table), storage, and the several RE project categories (pp2–5) — then sets the scope: the regulations apply where the Commission determines tariff under Section 62 read with Section 86 for RE stations commissioned during the control period, and they set eligibility criteria for wind, small hydro, solar PV, biogas, MSW, RDF, hybrid and storage projects, with Section 63 adoption reserved for larger projects (pp6–7).

The general principles follow: a three-year control period running FY2025-26 to FY2027-28 (p7); tariff periods aligned to useful life (p7); which technologies get generic tariff versus project-specific tariff (pp7–9); the petition and filing requirements (p9); procurement and must-run treatment of RE (p10); tariff structure and levelisation design (pp10–11); and treatment of over-generation (p11).

Chapter 3 sets the financial norms — capital cost, debt-equity, loan tenure and interest, depreciation, return on equity, working capital, O&M escalation, rebate, late payment surcharge, subsidy treatment and statutory charges (pp11–15). Chapters 4–11 then give technology-by-technology parameters and the split between generic and project-specific determination for small hydro, biogas, wind, solar PV, MSW/RDF, hybrid and RE-with-storage (pp15–20). Chapter 12 covers deviation from norms, power to relax, power to remove difficulties and power to amend (p21). Annexed form templates support tariff filings and levelised tariff computation (pp22–28).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of SSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on sserc.org ↗

Report an issue with this document