KERC · Karnataka Electricity Regulatory Commission
Karnataka Electricity Distribution Code (KEDC), 2024 — Draft
KERC (Karnataka Electricity Distribution Code) Regulations, 2024
Draft codeDated 20 Jan 2025KERC/KEDC/2024-25/1345 dated 20.01.2025
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Karnataka Electricity Regulatory Commission has issued a draft replacement for the state's electricity distribution code. Notification KERC/KEDC/2024-25/1345, dated 20 January 2025, publishes the Draft Karnataka Electricity Distribution Code (KEDC), 2024 for stakeholder comments, which are due by 21 February 2025 (p1, p4–5). It is proposed under section 181(2)(zp) read with section 42(1) of the Electricity Act, 2003, and would come into force from the date of publication in the Karnataka Gazette; no Gazette date is printed (p5).
The preamble explains that the existing KEDC 2015, notified on 3 February 2016, is to be revised to align with the CERC (Indian Electricity Grid Code) Regulations, 2023 and a list of CEA/CERC/FoR regulations and guidelines on metering, connectivity, grid standards, distributed generation, communication, cyber security, safety, construction and distribution transformer O&M (p3–4). The draft applies to all distribution licensees including deemed licensees, open access consumers connected to the distribution system, users including the transmission licensee, entities covered under the section 13/section 14 proviso, and small generating units/CGPs synchronised with the distribution system (p9–10, p45).
Chapter 1 defines terms used in the Code (p5–9). Chapter 2 sets the Code's objectives and scope: it covers a Distribution Planning Code, a Distribution Operation and Maintenance Code and Safety Standards; it sets applicability and implementation duties, creates a Distribution Code Review Panel (DCRP) with BESCOM involvement, and deals with code management, unforeseen circumstances and non-compliance (p9–14). Chapter 3, the Distribution Planning Code, specifies planning objectives, system construction and security planning, planning procedures and standards, GIS and consumer indexing, energy audit, safety standards, harmonics and power quality, voltage regulation, design criteria for lines, reliability analysis, distribution transformer standardisation, quality assurance, substation layouts, DTCs, reactive compensation, service mains and metering (p14–41). Chapter 4, the Distribution Operation and Maintenance Code, specifies establishment and functions of Distribution Control Centres, demand estimation, outage and contingency planning, distribution system failure, demand management and load shedding, interface with small generating units/CGPs, metering and protection, communication, voltage and power factor monitoring, safety coordination, maintenance and testing, tools and spares, training, construction/O&M standards, operational criteria, maintenance and inspection (p42–66). Chapter 5 contains power to relax, power to remove difficulty, repeal and savings, and suo-motu orders/practice directions; it would repeal KEDC 2015 and subsequent amendments from commencement (p67).
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.