TERC · Tripura Electricity Regulatory Commission
Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations, 2009
Tripura Electricity Regulatory Commission (Cogeneration & Generation of Electricity from Renewable Sources of Energy) Regulations 2009
RegulationDated 23 Mar 2009Published in the Gazette 27 Nov 2009F.I7/TERC/2009 dated 23rd March, 2009
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Tripura Electricity Regulatory Commission's principal regulation for cogeneration and renewable-source generation, published as a Tripura Gazette extraordinary issue dated 27 November 2009 and made under Electricity Act 2003 s.181(1) and s.181(2)(zp) read with s.86(1)(e) (p1). It applies within Tripura and is signed by the Commission Secretary at Agartala on 23 March 2009 (p5).
Clauses 1–2 (pp1–3) cover title, commencement on Gazette publication, extent, interpretation and definitions. The definitions are important for scope: 'renewable source' includes small/mini/micro hydro up to 25 MW, wind, solar, biomass, municipal/industrial waste, geothermal, tidal and OTEC, or other sources approved by the Ministry of Non-conventional Energy Sources or the Tripura government; they also define the Nodal Agency, SNA for NECS (TREDA in Tripura), PPNPSA, licensee, SLDC, STU, UI and TOD.
Clause 3 (pp3–4) is the purchase-obligation core. It specifies a mandatory minimum renewable purchase obligation as a percentage of a licensee's total annual electricity consumption in its supply area, with a schedule for the first three years and later years left to separate Commission specification. Licensees must indicate proposed purchase quantum and sources in their ARR filings, give priority to in-area sources, fall back to other sources within Tripura on shortfall, and the Commission may review the quantum every three years or less and waive targets for supply constraints or uncontrollable factors. The same clause states mandatory open access for renewable generators to a licensee's transmission/distribution system or the grid, with best efforts by STU/SLDC/licensee to strengthen the system.
Clause 4 (pp4–5) deals with tariff. The Commission determines tariffs for cogeneration and renewable purchases, separately by renewable category, guided by CERC principles, the National Electricity Policy and the Tariff Policy. It sets out submission of cost data and PPAs, dispute referral to the Commission, and a public process of inviting proposals, public response, hearing and tariff order. Tariffs apply for 10 years from notification and are reviewed after 5 years, with revised tariffs applying to later agreements. Clause 5 (p5) makes failure to purchase liable to penalty under Section 142, with a no-availability excuse. Clauses 6–7 (p5) give the Commission difficulty-removal and amendment powers.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read TERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of TERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.